| What it is | Floor bowl, separate cistern on the wall, flush pipe between | Tank and bowl moulded together | Bowl on a steel frame, cistern hidden in the wall |
| Cleaning | Joint and flush pipe collect dirt | No joint; easier to wipe | Floor under the bowl is open; easiest to mop |
| Floor space | Bowl stands on the floor | Bowl stands on the floor; the longest of the three | Bowl off the floor; the room looks bigger |
| Waste pipe it needs | Floor drain (S-trap) | Floor drain at 220 or 300 mm | Pipe coming out of the wall |
| Wall it needs | Any wall that holds two screws for the cistern | Any | 9-inch brick with a chase, or a 150–200 mm ledge |
| Last day to decide | Before the floor is cast (drain) | Before the floor is cast (drain) | Before the walls are plastered |
| If something breaks | Change the cistern, seat or bowl on its own | A cracked tank means a new WC | Valve through the plate hole; parts must match the brand |
| Plumber | Any plumber | Any plumber; it is heavy to lift | One who has fitted a frame before |
| Parts to buy | Bowl, cistern, flush pipe, angle valve, connection pipe | One WC (seat cover in the box) | Bowl, frame with cistern, flush plate or knob, connector |
| Price | Lowest · Ask rate | Middle · Ask rate | Highest: the frame and cistern cost on top of the bowl |
| Suits | Second bathroom, rented floor, tight budget | Main bathroom in a new or finished house | New bathroom planned early, small floor, easy mopping |