हिंदी Call90310 74624
Home›Questions›Cement
Cement questions · 55 answers

Cement questions answered: price, bags, grades, freshness, slab and plaster

The short answers
  • Today's rate: on the rate page, entered every morning, per 50 kg bag, GST inside.
  • Which bag: PPC for walls, plaster and floors. Super or Premium for the slab, beams and columns. Weather Plus for the roof top and parapet.
  • After the slab: keep it wet for 14 days, counted from the day after dhalai.
  • Is it fresh: use a bag within about 3 months of the packing date printed on it.
50 kg
Every bag we sellThe rate is per bag, never a per-kg guess.
18%
GST on cementSince 22 Sep 2025, down from 28%.
14 days
Curing a slabIS 456 minimum is 10 for PPC; we use 14.
3 months
Shelf lifeFrom the packing date on the bag.
Read a bag before it comes off the truck
A cement bag with four things to check marked 1 to 4Type and IS number, packing date, an intact bag, and 50 kg weight. CEMENT PPC · IS 1489 Packed: week / year 50 kg 1234
Not to scale; colours are ours. Standards: IS 1489 is PPC, IS 16415 composite cement, IS 455 slag cement. Where a website and the bag differ, the bag is right.
  1. Type and IS number. PPC says IS 1489, composite IS 16415, slag IS 455. It must match your bill.
  2. Packing week and year. Use the bag within about 3 months of it.
  3. Bag whole. No tear, no re-stitching. UltraTech says Premium and Super come in tamper-proof bags.
  4. 50 kg. A light bag shows when you lift it beside the others.
Find your question

Short answers, each with a link to the full page. Rates are never typed here: they come from the counter each morning.

No answer here yet for .
Ask us on WhatsApp
Price

Rate, per bag, per kg, GST, and why it changes

Today's rate, the price of one bag, the per-kg sum, tax and delivery.

What is UltraTech cement's rate in Muzaffarpur today?

Our staff enter it every morning at the Rewa Road store: one rate for each of the four bags we sell, per 50 kg bag, GST included, with the time it was entered. It is on today's cement rate. The store is closed on Sunday, and Saturday's rate stands.

Read the full page →

UltraTech cement ki bori (katta) kitne ki hai? What is the price of one bag?

Bori, katta and bag all mean the same 50 kg pack. There is no single price for "UltraTech cement", because the four bags (PPC, Premium, Super, Weather Plus) each have their own rate. Look up your bag on the rate page, or send the bag type and number on WhatsApp and we reply with today's rate.

Read the full page →

What is the cement rate per kg?

The bag rate divided by 50. We quote per bag, never per kg, because cement is sold in 50 kg bags and a per-kg figure invites rounding. Pages that print one per-kg price for the whole country are averages. They are not what you pay at a counter in Muzaffarpur.

Is GST included in the cement rate?

Yes, in our rate. GST on cement came down from 28% to 18% on 22 September 2025, and the GST bill shows it. A page that still says 28% has not been checked since then.

Why is the rate I see online different from your rate?

Most pages online give an all-India or big-city range for a 50 kg bag, with no date and no source for the figure. Ours is a dated counter rate for Muzaffarpur, entered by our staff each morning, so a rise or a fall on our page is real.

Why does the cement rate keep changing?

Four things move it: the season (slab-pouring months are busy, the monsoon eases), freight and fuel, the company's own price changes to dealers, and tax. The page on why the rate changes explains each, and our rate page keeps a 30-day chart.

Read the full page →

Will cement get cheaper or dearer next week?

Nobody can say honestly, and we do not guess. What we can show is how our own rate moved over the last 30 days and when it stepped. If the work can wait a few weeks, watch that chart. If it cannot, buy for the next two weeks of work.

Read the full page →

Is OPC dearer than PPC?

Usually a little, according to ACC's FAQ, but it depends on the day. The rates of the bags we keep are on the rate page. If your drawing names OPC we can order it for you; ask on WhatsApp for the rate and the time it takes.

Is wholesale or a bulk order cheaper?

For a big order, send the number of bags and your site on WhatsApp and we give the rate for that order. Pages that print a bulk discount do not agree with each other, so we do not print a fixed one here.

Is delivery included in the rate?

No. The rate is for the bag at our Rewa Road store. Delivery is charged separately: tell us your area, or your village and block, and we reply with the amount for your site. See delivery.

Read the full page →

Buying

Buying and how many bags you need

Bag counts for a house, a slab and plaster; how to order; bill and authorisation.

How many bags for 1,000 sq ft?
Bags of cement for 1,000 sq ft: planning rangesBrick house with RCC roof 350 to 420 bags; RCC-frame house 400 to 500; roof slab alone 75 to 112; 12 mm plaster 35 to 40. 0100200300400500Brick house + RCC roof350–420RCC-frame house400–500Roof slab alone75–112Plaster, 12 mm35–40 bags of 50 kg
Planning ranges from published guides (JK Cement, Bricknbolt, NoBroker, infralens), not a bill of quantities. The calculator uses your own sizes.
How many bags of cement for a 1,000 sq ft house?

As a planning range: about 350 to 420 bags for a load-bearing brick house with an RCC roof (the common build in Bihar), and 400 to 500 bags (0.4 to 0.5 bag per sq ft) for an RCC-frame house. Floors, wall thickness, plaster on both sides and flooring move the number, so treat it as a plan, not a bill. The calculator works out yours.

Read the full page →

How many bags for a 1,000 sq ft roof slab?

About 75 to 112 bags, depending on whether the slab is 4 inch or 5 inch and on the mix. The roof-slab guide walks from length, width and thickness to bags, sand and gitti.

Read the full page →

How much cement for plastering 1,000 sq ft?

About 35 to 40 bags at 12 mm thickness. Plaster on both sides of a wall counts twice. A thicker coat or a richer mix needs more.

Read the full page →

Which bag goes where in a house?

PPC for brickwork, inside plaster and floors. Super (or Premium) for columns, beams and the slab. Premium for footings, plinth and underground tanks. Weather Plus for the roof top, parapet and outside plaster. One bag type per pour: never two kinds in one slab.

Read the full page →

Can I order cement on WhatsApp?

Yes. Send three things: the bag type, the number of bags and your place. We reply with today's rate and the delivery amount, so you see both before you decide. Then you pay and take the GST bill.

Read the full page →

Will I get a GST bill?

On every sale. The bill names the UltraTech bag type and the number of bags. Keep it: it is your proof of where the cement came from.

Are you an authorised UltraTech dealer?

Yes. Tashya Ventures is an authorised UltraTech Building Solutions store at 199 Patahi Rd (Reva Road), near Shiv Mandir, Bhagwanpur, Muzaffarpur 843113. To check any store, you can ask UltraTech on its toll-free number 1800 210 3311.

Read the full page →

Can I buy cement on UltraTech's website?

UltraTech's own pages say the company does not sell through WhatsApp, SMS, calls or email, and send buyers to its Building Solutions stores. So the sale happens at a store. Ours takes your order on WhatsApp and gives a GST bill.

Can you get a cement that is not on your shelf, like OPC 53 or white cement?

Yes, we can order it for you; ask on WhatsApp for the time it takes. First check that you need it: for most house work the four bags on our shelf are enough, and white cement is for tile joints and finish only.

Which cement

Which cement: OPC, PPC, grade and brands

What the bag types and grade numbers mean, and which bag goes in which part of the house.

Which bag goes where in a house
A house in section with a bag type for each partRoof top and parapet Weather Plus; slab, beams, columns Super; walls and floor PPC; footings, plinth and tank Premium. 12345
Our usual pick for each part, not UltraTech's rule. Your engineer's drawing comes first. Bag types are UltraTech's own words. One bag type per pour.
  1. Roof top and parapet · Weather Plus
  2. Slab, beams, columns · Super (or Premium)
  3. Brick walls, inside plaster · PPC
  4. Floor base · PPC
  5. Footings, plinth, underground tank · Premium
OPC or PPC: which is better for a house?

PPC, for nearly every job in a house: footing, columns, slab, brickwork, plaster, floor. It gives off less heat and cracks less in a Bihar summer. OPC suits jobs that need early strength: props that must come out early, precast lintels and jaali, or a drawing that names OPC. PPC needs 10 days of curing, OPC 7.

Read the full page →

Is PPC good for a slab, beams and columns?

Yes. UltraTech's own FAQ says PPC can be used for RCC work, especially in houses where long-term durability matters. Because it starts slower, cure it fully and keep the props in longer. For the frame our usual pick is Super or Premium.

Read the full page →

Is there a 53 grade PPC?

No. UltraTech says there are no grades in PPC, and puts its strength level equal to OPC 33. If someone asks you for "PPC 53", ask what is printed on the bag.

Read the full page →

What do 33, 43 and 53 grade mean?

The number is the minimum 28-day strength of OPC in MPa, tested in the lab on a cement-mortar cube (IS 269): 33, 43 or 53. It is the cement's number, not your slab's.

Read the full page →

Should I use 53 grade for the roof?

Not necessarily. A roof is concrete, and whether it reaches M20 depends on the water, the vibration and the curing more than on the grade. A watery, badly cured OPC 53 slab ends up weaker than a blended one done properly. OPC 53 helps when shuttering must come off fast, which on a family house is seldom needed.

Read the full page →

Can I use two kinds of cement in one house?

Yes, for different jobs: for example PPC for plaster and Super for the slab. Not within one slab, one pour or one stretch of plaster, and never two types of bag in the same batch. Pick one bag type for each pour.

Is cement waterproof?

No ordinary cement is waterproof on its own. UltraTech Weather Plus is a water-repellent cement, which helps. A roof still needs WP+200 in the mix and a Hi-Flex coating on top.

Read the full page →

What is the difference between Premium, Super and Weather Plus?

Premium is UltraTech's slag blend (resists sulphates and chlorides, good for damp ground). Super is what UltraTech calls a "modified PPC", with early strength. Weather Plus is a water-repellent cement for roofs and walls that meet rain. All four bags can build a whole house; the difference is what each adds and what it costs.

Read the full page →

Is darker cement better? Is fast-setting cement better?

Colour does not tell you strength; it changes with the ingredients and the batch. Judge a bag by its IS number, its packing date and whether it is intact. Fast setting is not better for a house: the standards let cement start setting after 30 minutes at the earliest, and a slower, cooler set gives the mason time and cracks less.

What is white cement for?

Tile joints and decorative finish only. It is made without the iron that turns cement grey. Never use it in a slab, column or plaster coat. Rates are on putty and white cement rates.

Which cement is best for house construction?

No one bag is best for the whole house. Each job has a right bag (see the answer above on which bag goes where). A fresh bag and proper curing matter more than the name on it.

Read the full page →

UltraTech or ACC, Ambuja, Dalmia: which is better?

All of them make bags to the same IS codes, and a good house can be built with any. Compare the type printed on the bag and the packing date, not the advertising. We sell UltraTech because we are its authorised store, so every job gets the right bag from one range.

Read the full page →

Are ACC and Ambuja the same company?

They sit in the same group (Adani), and Ambuja's own FAQ takes up this question. They are still sold as two brands.

Quality

Freshness, storage and genuine bags

How old is too old, lumps, storing at the site, and what to check at the gate.

A cement stack at the site
A stack of cement bags kept off the ground, covered, and away from the wallBags on planks on bricks, plastic sheet over the stack, a gap from the damp wall, a low stack. 1234
Not to scale. Stack height: usual practice. Storage advice: UltraTech and the checklist on our dhalai page.
  1. Gap from the wall. Damp walls sweat into the bags.
  2. Plastic over and down the sides. Rain and ground damp both ruin cement.
  3. Planks on bricks. Never bags on bare ground or a wet floor.
  4. Low stack. No more than 10 bags high; oldest bags used first.
How old can cement be?

Use it within about 3 months of the packing date on the bag, kept dry (UltraTech; Bangur says the same). After that it slowly loses strength, and the longer it sits the more it loses. Cement kept damp goes sooner.

Read the full page →

How do I know how old a bag is?

Read the packing week and year printed on the bag and count from that date. Do it at the gate, before the bags come off the vehicle, not after.

The bag has lumps. Can I use it?

Press the bag. It should feel soft and powdery. Hard lumps that do not crumble mean the cement has started to set from damp, so do not use that cement for the frame or slab; ask us or your engineer. If bags arrive like this, tell us at once.

How do I store cement at the site, especially in the monsoon?

On planks or a platform, off the ground, away from damp walls, covered, and stacked no higher than 10 bags (usual practice). Use the oldest bag first. In the monsoon buy for about two weeks of work, not the whole house; we deliver in lots.

Read the full page →

How do I tell genuine cement from fake?

Check four things at the gate: the bag is whole (no tear, not re-stitched), the type matches your bill, the bag is not light, and the packing date is recent. Buy from an authorised store and take the GST bill. UltraTech says Premium and Super come in tamper-proof bags.

Read the full page →

How much should a bag weigh?

50 kg. Every bag we sell is a 50 kg bag, and the rate is per bag. A light bag shows when you lift it next to the others; if in doubt, tell us before it is unloaded.

How long does cement take to set?

The standards for both OPC and PPC say it must not start setting before 30 minutes and must finish within 10 hours. In practice PPC stays workable a little longer. Setting is not curing: the slab still needs its 14 days wet.

Can I buy all the cement for the house at once?

You can, but long storage costs strength and a damp site spoils bags. It is better to buy about two weeks of work at a time, close to the pour. On slab day keep two or three spare bags on site so you never run short mid-pour.

Read the full page →

On site

On site: water, curing, shuttering, slab, plaster

The questions masons and owners ask on dhalai week and plaster week.

Curing after a roof slab, day by day
Curing after a roof slab, day by dayWet curing for 14 days, with OPC and PPC minimums at 7 and 10 days; day 28 is the test day, not a curing count. WET · 14 DAYS not curing wet sacks, then ponds01OPC min.7PPC min.10our rule14test day28days after dhalai props stay we keep to 14 Props under a slab, span up to 4.5 m
Curing days: IS 456 cl. 13.5.1 (7 for OPC, 10 for blended or hot weather, may go to 14). Props: IS 456 cl. 11.3, for OPC in mild weather. Ponding: UltraTech. Day 28 is when concrete strength is tested.
How much water per bag of cement?

For concrete, at most 25 litres per 50 kg bag (water-cement ratio 0.5), and less if the sand is wet. Use one marked bucket so every batch gets the same. The water already in the sand counts.

Read the full page →

What does extra water do?

It makes the mix easy to place and the slab weak and porous. Masons add water for ease. Every extra bucket costs strength and leaves pores that let rain through. Keep the ratio and use the vibrator to settle the concrete, not water.

Read the full page →

What mix for a roof slab?

M20 is the lowest grade IS 456 allows for RCC, usually 1:1.5:3 (cement : sand : gitti). Your engineer's drawing decides; follow it if it says more.

Read the full page →

How many days of curing after chhat dhalai?

14 days, counted from the day after dhalai. IS 456 asks for at least 10 days for PPC and blended bags and in hot, dry weather (7 for OPC), and says the minimum may be extended to 14. We use the safe end for every bag.

Read the full page →

How do I cure a slab: when to start and what to do?

The same evening, as soon as the surface is firm enough to walk on, lay wet jute sacks or spray finely (not a pipe jet). Next morning make low bunds and fill ponds 25 to 50 mm deep, and keep them full. Never let the slab go dry, not even for a hot afternoon.

Read the full page →

Why not cure for 21 or 28 days?

No standard or maker asks for that on a roof slab. 28 days is when concrete strength is tested, not a curing period. Longer does no harm if you can manage it, but 14 days with no dry afternoon beat 28 days done half-heartedly.

Read the full page →

Do Weather Plus or WP+200 mean I can skip curing?

No. Weather Plus repels water once the concrete has hardened. While it sets it needs water like any cement, so it gets the same 14 days. WP+200 in the mix does not replace curing either.

How much WP+200 per bag?

200 ml per 50 kg bag of cement, as UltraTech's Weather Pro brochure gives it. It is for waterproofing in the mix; on a roof a coating still goes on top.

Read the full page →

When can I remove the shuttering?

Side plates of beams and columns come off in 16 to 24 hours (IS 456). Props under a slab: 7 days for spans up to 4.5 m, 14 days over that. Props under beams: 14 days up to 6 m, 21 over. Those days are for OPC in mild weather; with PPC or in cold, allow more. On a house slab we keep props 14 days, and your engineer gives the final day.

Read the full page →

When can I stack bricks or bags on a new slab?

Not in the first week. With PPC, leave the props in longer too, and keep heavy loads off the slab until the engineer says so. Stacks also break the pond bunds and leave dry patches.

What cement-sand ratio for plaster, and how thick?

Usual practice: inside walls 1:6 at about 12 mm; outside walls a richer 1:4 at 15 to 20 mm; ceiling 1:3 or 1:4 at 6 mm. Published sources differ on these, so follow your engineer's or mason's drawing. Use clean, sieved sand. Wet sand takes more room in the bucket, so you get less real sand.

Read the full page →

How many days should plaster be cured?

Keep it damp: at least 7 days is usual practice. Plaster on a sunny wall in May or June dries within hours, so wet it several times a day from the next day. Plaster that dries fast is where hairline cracks start.

Read the full page →

What mortar mix for brickwork?

Usual practice is 1:6 (cement : sand) for a 9-inch wall and 1:4 for a half-brick wall. PPC suits brickwork because the mortar stays workable longer. Soak the bricks first.

Read the full page →

How long can I use mixed mortar?

Usual practice: within about 30 minutes of adding water. If it has stiffened, do not add water and reuse it; throw it away. Mix only what the mason can use in that time, especially in May and June.

Can I do chhat dhalai in May or June?

Yes, with care. Start at first light and do not stop, cover with wet sacks the same afternoon, make ponds next morning, and check more often: in May and June about every 2 hours for sacks and three times a day for ponds.

Read the full page →

Abhishek Ranjan
Diploma Civil Engineer, Tashya Ventures

Answers cement, sariya and structure questions at our Reva Road store, Muzaffarpur. Every figure on this page was checked against UltraTech's own pages and the Indian Standards on 12 Nov 2026. Where makers or sources disagree, the answer says so and goes with the safer figure.

Where the numbers come from

  1. UltraTech, product pages for PPC, Premium, Super and Weather Plus: types, uses, "no grades in PPC", strength level equal to OPC 33, "PPC can be used for RCC work", tamper-proof bags, no sale through WhatsApp, SMS, calls or email, toll-free 1800 210 3311.
  2. UltraTech, Weather Pro brochure: WP+200 at 200 ml per 50 kg bag. UltraTech curing and ponding guide: ponds 25 to 50 mm deep, wet sacks first.
  3. Bureau of Indian Standards: IS 456:2000 (M20 minimum, 1:1.5:3 nominal mix, cl. 13.5.1 curing, cl. 11.3 stripping times, water-cement ratio 0.5), IS 269 (OPC 33, 43, 53), IS 1489 Part 1 (PPC), IS 455 (slag cement), IS 16415 (composite cement). Setting time, 30 minutes to 10 hours, is the same limit in the OPC and PPC standards.
  4. ACC, cement types blog and FAQ: OPC generally a little dearer than PPC. Bangur Rockstrong FAQ: about 3 months shelf life from manufacture. Ambuja FAQ: the ACC and Ambuja question.
  5. JK Cement, cement prices in India: prices vary by city, freight and dealer margin; reviewed monthly or bi-monthly. Bag counts (350 to 420, 400 to 500, 75 to 112, 35 to 40) are the published planning ranges gathered from JK Cement, Bricknbolt, NoBroker and infralens.
  6. GST on cement cut from 28% to 18%, effective 22 September 2025 (GST Council). Plaster, brickwork and mortar-time figures marked "usual practice" are common site and CPWD-style practice; the sources differ, so the drawing and your engineer decide.

Not here? Ask us

Send your cement question or your job on WhatsApp. We answer, and add the question to this page.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com