Cement, sand and gitti calculator: slab, column, plaster, brickwork

The quick answer, per 100 sq ft
JobBagsBaluGitti
Roof slab, 5 inM20, 1:1.5:39½17½ cft35 cft
Brick wall, 9 inmortar 1:6321½ cft—
Floor PCC, 3 in1:4:82½12 cft24 cft
Inside plaster, 12 mm1:6, one face¾5½ cft—

Before wastage; add about 5%. For your own sizes, mix and rate, use the calculator just below. It adds several jobs into one list you can send us.

1.23 cft
One 50 kg bagCement weighs about 1,440 kg per cubic metre, loose.
× 1.54
Dry stuff for wet concrete1 cu m poured needs about 1.54 cu m of dry cement, balu and gitti.
25 L
Water per bag, slabIS 456 limit for a roof open to rain: water-cement ratio 0.50.
What 100 sq ft of roof slab takes
Material for a 10 by 10 foot roof slab, 5 inches thick, M20 A slab 10 feet by 10 feet and 5 inches thick holds about 41.7 cubic feet of concrete. It takes about 9 and a half bags of cement, 17 and a half cubic feet of sand, 35 cubic feet of gitti and about 240 litres of water. 10 ft 10 ft 5 in 41.7 cft poured = 1.18 cu m · dry material × 1.54 9½ bags cement, 50 kg each ≈ 476 kg 17½ cft balu (sand) 35 cft gitti, 20 mm ≈ 240 L water, w/c 0.50 Plus about 5% wastage. Sariya, shuttering and labour are extra.
Sand and gitti in dry, loose cft, the way they are sold. Standard dry-volume method; IS 456 water limit for a roof open to rain.
Calculator

Your job, your mix, your rate

Pick the work, put in the size, check the mix. The list on the right updates as you type. Add more jobs (slab, then beams, then columns) and send the whole list to us.

1 · The work
2 · The size
—
3 · The mix
:
:

—

4 · Your rate (optional)

Filled in from today's cement rate and balu and gitti rate. Type your own to compare. Cutting and delivery are charged separately; ask for the amount for your site (delivery).

Your list

—
Cement, 50 kg bags——
Balu (sand)——
Gitti (stone chips)——
Water for mixing——
Material totalAsk rate
Send to Tashya on WhatsApp

Estimate by the standard dry-volume method. Your mason's thickness and brick size change it. Sariya for this job: sariya calculator. Bricks: bricks calculator. Whole house: house cost calculator.

How it is worked out

Why 100 cft of slab needs about 154 cft of material

Masons and engineers all use the same four steps. Once you see them you can check any count your thekedar gives you.

Wet concrete is smaller than the dry heap
Wet volume and dry volume On the left, one cubic metre of poured concrete. On the right, the heap of dry cement, sand and gitti needed to make it, about 1.54 cubic metres, split 1 to 1.5 to 3 for M20. The heap shrinks because sand fills the gaps between stones and cement fills the gaps in the sand. 1.00 poured (wet) shrinks gitti 3 balu 1.5 cement 1 1.54 dry, loose heap 1 bag = 50 kg = 1.23 cft so in M20, each bag goes with 1.8 cft balu and 3.7 cft gitti
1.54 for concrete is the standard estimating figure; for mortar the figure is 1.33, because there are no stones to fill around.
  1. Find the wet volumeLength × width × thickness, all in feet. A 5 inch slab is 5 ÷ 12 = 0.42 ft thick.
  2. Turn it into dry volume× 1.54 for concrete, × 1.33 for mortar. Plaster gets 20% more on top, because brick walls are never flat and the first coat fills the dips.
  3. Split it by the mixFor 1:1.5:3 there are 5.5 parts. Cement is 1 part, balu 1.5, gitti 3.
  4. Turn cement into bagsCement cft ÷ 1.23 = bags. Water for concrete is 0.50 × cement kg.
Worked example: a 30 × 25 ft roof, 5 in thick, M20
30 × 25 × 0.417 = 312.5 cft wet → × 1.54 = 481 cft dry
Cement 481 ÷ 5.5 = 87.5 cft ÷ 1.23 = 71 bags · balu 131 cft · gitti 262 cft
With 5% wastage: 75 bags, 138 cft balu, 276 cft gitti, about 1,870 litres of water.
Mortar jobs: where the cement goes
Brick wall joints and plaster layer Joints ≈ ¼ of the wall with 3 in local bricks and 10 mm joints Plaster 12–20 mm +20% for an uneven wall
Standard estimating figures, not a maker's sheet. Thicker joints or uneven bricks take more mortar.
Which mix for which job

The mixes the calculator starts with, and when to change them

Concrete mixes are the nominal mixes of IS 456. Mortar and plaster mixes are usual practice. If your engineer's drawing says something else, use the drawing: change the mix in step 3.

JobStarts withOther choices
Roof slab, beams, columnsRCC, with sariyaM20 · 1:1.5:3M25 · 1:1:2 for a roof open to rain (see the note below). M15 · 1:2:4 only where the drawing allows.
Footing, lintel, chhajjaRCCM20 · 1:1.5:3Same as slab. Use the Column / beam option with the footing's size.
PCC under footings and floorsno sariya1:4:81:3:6 for a stronger floor base; 1:2:4 for a ramp or a floor that takes a vehicle.
Brick wall, 9 in1:61:5 or 1:4 for a load-bearing ground floor wall, if the engineer asks.
Brick wall, 4½ inpartition1:4A thin wall needs the stronger mortar. 1:5 at the leanest.
Inside plaster, 12–15 mm1:61:5 on rough walls.
Outside plaster, 20 mm1:4Two coats. Add WP+200 to the water on walls that face the rain.
Ceiling plaster, 6 mm1:3A thin coat must be rich to stick overhead.
Floor bed under tiles or marble1:41:6 dry bed only if the tile maker allows it.
A roof open to the rain counts as "moderate" exposure in IS 456.For that, IS 456 asks for at least M25, no more than 0.50 water-cement ratio and at least 300 kg of cement per cubic metre. It also allows the simple volume mixes (1:1.5:3 and so on) only up to M20. In practice most house roofs in Bihar are still poured in 1:1.5:3. If you go to M25, ask your engineer for the mix and watch the water closely. We can talk it through on WhatsApp before dhalai.
Where bags go missing

Why the site uses more than the calculator says

BEAMS NOT COUNTED

Only the slab was counted

You run short on dhalai day

Beams under the slab, and the columns up to it, are poured the same day. Work out the slab, press "Add to list", then pick Column / beam and add the beams too.

dry damp: puffs up SAME SAND, MORE VOLUME

Damp sand puffs up

Mix comes out short of sand

Damp sand takes up more room than dry sand, so a ghamela of it holds less sand than it looks. IS 456 asks for an allowance for this when mixing by volume. Mix by bag and count ghamelas the same way every batch.

EXTRA WATER = WEAKER SLAB

Extra water for easy pouring

Weaker concrete, then more cement to "fix" it

For a roof, IS 456 caps water at half the cement weight: 25 litres per bag, counting the water already in wet sand. Watch the first batch and keep the same water for the rest.

Questions people ask us

Short answers

How many cement bags for 1000 sq ft?

For a 1000 sq ft roof slab, 5 inches thick in M20: about 95 bags, or 100 with wastage, plus about 175 cft of balu and 350 cft of gitti. Beams are extra. For a whole 1000 sq ft house from foundation to plaster, see cement for a 1000 sq ft house, or the house cost calculator.

Chhat dhalai ka kharcha kaise nikale?

Pick Roof slab, put in the length, width and thickness, and type the rate. You get bags, cft and the material cost. Then add the beams with Column / beam. Sariya comes from the sariya calculator. Labour, shuttering and mixer hire are what your thekedar quotes. Send us photos on WhatsApp before dhalai and we'll look at them with you.

How much sand goes with one bag?

One bag is about 1.23 cft. In 1:6 plaster or brickwork that is about 7.4 cft of dry sand per bag; in 1:4, about 4.9 cft. In M20 concrete it is about 1.8 cft of balu and 3.7 cft of gitti per bag.

What is the ratio for M20?

1:1.5:3 (cement : balu : gitti) by volume is the usual nominal mix. IS 456 gives about 250 kg of total aggregate per 50 kg bag for M20, and allows nominal mixes only up to M20.

How much water per bag of cement?

For a roof open to rain, IS 456 caps the water-cement ratio at 0.50: 25 litres per 50 kg bag, counting the water already in wet sand. For mortar there is no fixed figure; add water until it is workable, a little at a time. Curing water is extra.

Why does my mason's count differ from this?

Usually one of three things: he counted a thicker slab, he added more wastage, or he counted beams this page doesn't know about. Put his thickness in and add the beams. If the gap is still large, send us both counts.

Which cement for which job?

All four bags we sell are full cements for every job on this page. Plain PPC is the everyday bag for plaster, brickwork and PCC. For the slab, beams and columns many buyers take Premium, Super or Weather Plus. The differences are on Premium vs Super vs Weather Plus and UltraTech Super.

Where the numbers come from

  1. BIS, IS 456:2000 Plain and reinforced concrete, code of practice: Table 3 and Table 5 (a roof open to rain is "moderate" exposure: RCC at least M25, water-cement ratio at most 0.50, cement at least 300 kg/m³), clause 9.3 (nominal mix only up to M20), Table 9 (about 250 kg of aggregate per 50 kg cement for M20), and the volume-batching allowance for bulking of damp sand.
  2. Standard estimating figures, as used in PWD-style estimates: cement at 1,440 kg/m³ loose (so 50 kg = 0.0347 m³ = 1.23 cft), dry-volume factor 1.54 for concrete and 1.33 for mortar, 20% extra for plaster on brick, mortar about 25% of brickwork with 10 mm joints. Our cement rate page uses the same figures.
  3. Mortar and plaster mixes (1:6, 1:4, 1:3) and plaster thicknesses: usual practice for houses in north Bihar.
  4. UltraTech, ultratechcement.com product pages for Super and Weather Plus (positioning only; UltraTech publishes no quantity figures on them).

Send us your naksha or your sizes

We'll check the bags, balu and gitti with you and send back today's price on WhatsApp.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com