Only the slab was counted
Beams under the slab, and the columns up to it, are poured the same day. Work out the slab, press "Add to list", then pick Column / beam and add the beams too.
| Job | Bags | Balu | Gitti |
|---|---|---|---|
| Roof slab, 5 inM20, 1:1.5:3 | 9½ | 17½ cft | 35 cft |
| Brick wall, 9 inmortar 1:6 | 3 | 21½ cft | — |
| Floor PCC, 3 in1:4:8 | 2½ | 12 cft | 24 cft |
| Inside plaster, 12 mm1:6, one face | ¾ | 5½ cft | — |
Before wastage; add about 5%. For your own sizes, mix and rate, use the calculator just below. It adds several jobs into one list you can send us.
Pick the work, put in the size, check the mix. The list on the right updates as you type. Add more jobs (slab, then beams, then columns) and send the whole list to us.
Estimate by the standard dry-volume method. Your mason's thickness and brick size change it. Sariya for this job: sariya calculator. Bricks: bricks calculator. Whole house: house cost calculator.
Masons and engineers all use the same four steps. Once you see them you can check any count your thekedar gives you.
312.5 cft wet → × 1.54 = 481 cft dry87.5 cft ÷ 1.23 = 71 bags · balu 131 cft · gitti 262 cftConcrete mixes are the nominal mixes of IS 456. Mortar and plaster mixes are usual practice. If your engineer's drawing says something else, use the drawing: change the mix in step 3.
| Job | Starts with | Other choices |
|---|---|---|
| Roof slab, beams, columnsRCC, with sariya | M20 · 1:1.5:3 | M25 · 1:1:2 for a roof open to rain (see the note below). M15 · 1:2:4 only where the drawing allows. |
| Footing, lintel, chhajjaRCC | M20 · 1:1.5:3 | Same as slab. Use the Column / beam option with the footing's size. |
| PCC under footings and floorsno sariya | 1:4:8 | 1:3:6 for a stronger floor base; 1:2:4 for a ramp or a floor that takes a vehicle. |
| Brick wall, 9 in | 1:6 | 1:5 or 1:4 for a load-bearing ground floor wall, if the engineer asks. |
| Brick wall, 4½ inpartition | 1:4 | A thin wall needs the stronger mortar. 1:5 at the leanest. |
| Inside plaster, 12–15 mm | 1:6 | 1:5 on rough walls. |
| Outside plaster, 20 mm | 1:4 | Two coats. Add WP+200 to the water on walls that face the rain. |
| Ceiling plaster, 6 mm | 1:3 | A thin coat must be rich to stick overhead. |
| Floor bed under tiles or marble | 1:4 | 1:6 dry bed only if the tile maker allows it. |
Beams under the slab, and the columns up to it, are poured the same day. Work out the slab, press "Add to list", then pick Column / beam and add the beams too.
Damp sand takes up more room than dry sand, so a ghamela of it holds less sand than it looks. IS 456 asks for an allowance for this when mixing by volume. Mix by bag and count ghamelas the same way every batch.
For a roof, IS 456 caps water at half the cement weight: 25 litres per bag, counting the water already in wet sand. Watch the first batch and keep the same water for the rest.
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
UltraTech PPCPlaster, brickwork, PCC, floors₹ 330per bag UltraTech PremiumA step up for slab, beams, columns₹ 471per bag UltraTech Super"Modified PPC", foundation to roof₹ 435per bag UltraTech Weather PlusWater-repellent: roof and damp areas₹ 440per bagAnything not on the shelf, we can order for you; ask on WhatsApp for the time it takes. Today's prices: cement rate · balu, gitti, eent rate · sariya rate. Which bag for which job: Premium vs Super vs Weather Plus.
For a 1000 sq ft roof slab, 5 inches thick in M20: about 95 bags, or 100 with wastage, plus about 175 cft of balu and 350 cft of gitti. Beams are extra. For a whole 1000 sq ft house from foundation to plaster, see cement for a 1000 sq ft house, or the house cost calculator.
Pick Roof slab, put in the length, width and thickness, and type the rate. You get bags, cft and the material cost. Then add the beams with Column / beam. Sariya comes from the sariya calculator. Labour, shuttering and mixer hire are what your thekedar quotes. Send us photos on WhatsApp before dhalai and we'll look at them with you.
One bag is about 1.23 cft. In 1:6 plaster or brickwork that is about 7.4 cft of dry sand per bag; in 1:4, about 4.9 cft. In M20 concrete it is about 1.8 cft of balu and 3.7 cft of gitti per bag.
1:1.5:3 (cement : balu : gitti) by volume is the usual nominal mix. IS 456 gives about 250 kg of total aggregate per 50 kg bag for M20, and allows nominal mixes only up to M20.
For a roof open to rain, IS 456 caps the water-cement ratio at 0.50: 25 litres per 50 kg bag, counting the water already in wet sand. For mortar there is no fixed figure; add water until it is workable, a little at a time. Curing water is extra.
Usually one of three things: he counted a thicker slab, he added more wastage, or he counted beams this page doesn't know about. Put his thickness in and add the beams. If the gap is still large, send us both counts.
All four bags we sell are full cements for every job on this page. Plain PPC is the everyday bag for plaster, brickwork and PCC. For the slab, beams and columns many buyers take Premium, Super or Weather Plus. The differences are on Premium vs Super vs Weather Plus and UltraTech Super.
We'll check the bags, balu and gitti with you and send back today's price on WhatsApp.