हिंदी Call90310 74624
Home›Today's rate›Balu, gitti, eent
Today's rate · Muzaffarpur

Balu, gitti and eent rate today in Muzaffarpur

Rate for — · set at the store each morning
Today's rate board
Balu (sand)
Lal baluCoarse, red. For dhalai and concreteAsk rateper cftAsk rateper trolley
Local baluFine, pale. For filling and mortar mixAsk rateper cftAsk rateper trolley
Gitti (stone chips)
20 mm gittiSlab, beam, column, lintelAsk rateper cft
10 mm gittiThin sections, small precastAsk rateper cft
40 mm gittiPlain concrete under footings and floorsAsk rateper cft
Eent (bricks)
Awal eentFirst class: even colour, sharp edgesAsk rateper 1,000
Doyam eentSecond class: inside and boundary wallsAsk rateper 1,000
GSTBalu and gitti 5%. Bricks 12% (6% if the kiln takes no input credit). Shown on the bill.
DeliveryCharged by distance. Ask for the amount for your site: delivery.
TrolleyUsually about 100 cft. Measure yours before paying: how.
BilledBalu and gitti per cft, bricks per piece. Quoted per trolley and per 1,000.

This week: —

How a trolley of balu is measured
Measuring a tractor trolley load A tractor trolley filled level with sand. Length 10 feet, width 5 feet, height of the load 2 feet. Length times width times height gives 100 cubic feet, which is one brass. heaped? level it first to tractor Length (L) 10 ft Width (W) 5 ft Height 2 ft L × W × H = cft Example: 10 × 5 × 2 ft = 100 cft = 1 brass
Measure inside the trolley walls, in feet. If the load is heaped, level it, or take the height at the four corners and the middle and use the average. A tractor trolley is usually about 100 cft (usual practice; Patna Press also describes a trolley load as "around 100 cubic feet").
Check the load

Is your trolley really 100 cft?

A rate per trolley only means something if you know how much is in it. Put in what you measure with a tape. The page works out the cft and what it comes to at today's rate.

Height is in inches because that is how a tape reads it at the trolley side: 24 inches = 2 ft. Measure inside the walls. For a heaped load, average five heights (four corners and the middle).

This load

—cft
0100 cft, a usual trolley
In brass—1 brass = 100 cft
In cubic metres—1 m³ = 35.3 cft. Engineers' drawings use m³.
At today's rateAsk rateAsk rate per cft × cft. Delivery extra.
Order this much on WhatsApp

Need the number of trolleys for a whole house? Use the cement, sand and gitti calculator or read how many cft in a trolley.

The calendar sets the price

Why balu jumps before 15 June, and gitti doesn't

The three materials come from three different places, and each has its own season. Knowing which is which tells you when to buy.

Supply calendar for sand, stone chips and bricks in Bihar Balu: river ghats shut from 15 June to 15 October, rate climbs in the weeks before, ghats reopen 16 October. Gitti: quarry stone, no river ban, rain slows trucks July to September. Eent: kilns usually rest from July to October and sell from stock. JFMAMJJASOND BALU · river ghats GHATS SHUT 15 Jun15 Oct stocking up · rate climbs16 Oct: reopen GITTI · stone quarries NO RIVER BAN · SUPPLY ALL YEAR rain slows the trucks EENT · brick kilns KILNS REST usual practice: rain stops the firing, bricks sold from stock supply running river ghats shut kilns rest

Balu comes out of rivers

River sand mining in Bihar stops every year from 15 June to 15 October, under the monsoon conditions set for the ghats. Only stock already lifted can be sold. In the weeks before the ban, everyone tries to buy at once. Patna Press reported a 100 cft trolley going from ₹5,000–5,500 to ₹7,000–8,000 in about 15 days in May 2026.

Gitti comes from quarries

Stone chips are crushed rock, not river material, so the river ban does not stop them. In May 2026, when sand jumped, traders told Patna Press that gitti had stayed steady. What moves gitti is transport: diesel, distance from the crusher, and roads in the rains.

Eent comes from kilns

Kilns mould and fire in the dry months. In the rains they usually stop, and bricks are sold from the stack. Common practice is to book bricks before the monsoon if you plan to build walls in it.

If you are building after June: buy the sand for your slab and plaster in April or May and stack it on a raised, covered spot so rain does not wash the fine part away. More on the yearly ban: balu mining ban, June to October.

Know what you are buying

Which balu, which gitti, which eent

The rate depends on the kind. A cheap rate for the wrong kind costs more later, in a weak slab or plaster that won't hold.

LAL BALU · coarse LOCAL BALU · fine
Balu

Coarse for concrete, fine for filling

  • Lal balu (coarse, reddish, gritty between the fingers): dhalai, columns, beams, PCC, and good plaster. "Morang" is the name used for coarse sand in UP; same job.
  • Local balu (fine, pale, from nearby rivers): earth filling under floors. Some masons mix it into brickwork mortar. Never use it alone in concrete.
  • Plaster wants clean sand without clay. Sieve it on site.
Usual practice in North Bihar. Which sand for which job, in detail: plaster or dhalai · our balu
10 mm20 mm40 mm thin workslab · beam · columnPCC · floor base
Gitti

20 mm for the house frame

  • 20 mm: roof slab, beams, columns, lintels. IS 456 says 20 mm suits most reinforced concrete.
  • 40 mm: plain concrete (PCC) under footings and under floors, where there are no bars to get past.
  • 10 mm: thin sections and small precast work such as covers and jaali. Often mixed in with 20 mm.
  • Good gitti is angular, clean and has few flat, flaky pieces. Dust and clay weaken the concrete.
Sizes are the standard ones in IS 383. Which size where: gitti size guide · our gitti
ting AWALDOYAMJHAMA 1st class2nd classover-burnt
Eent

Awal for walls that carry load

  • Awal (first class): even red colour, straight sharp edges, a clear ring when two are struck. For outside walls and walls that carry the roof.
  • Doyam (second class): patchy colour, some chipped corners. For inside partitions and boundary walls that will be plastered.
  • Jhama: over-burnt, dark and often bent. Hard, but won't lay straight. Used broken for soling under floors.
Class names are the local usual practice; sizes vary by kiln, so measure a few from the stack. Weighing the choice: fly ash or red brick · our eent
At your site, before you pay

Four checks that take ten minutes

Do them with the driver still there. If something is wrong, it goes back on the same trolley.

24 in L × W × H
1 · Quantity

Measure the trolley

Tape the length, width and load height inside the walls. Put the numbers into the trolley check above. A load well short of what you paid for goes back or gets topped up.

e-CHALLAN Vehicle no.Mineral: sandQuantityValid till VERIFIED
2 · Paper

Ask for the e-challan

In Bihar every load of sand on the road must carry an e-challan from the Mines and Geology Department. Check it by number or QR on the department's Khanan Soft site (Verify e-Challan). Sand without one can be seized, with your name on the site.

silt sand 1 sand to ¼ of a jar2 salty water to ¾3 shake, leave 3 h silt ≤ 8% of sand more: wash it or return it
3 · Sand

Jar test for mud

Silt and clay settle on top of the sand. If that layer is more than about 8% of the sand under it, the sand is dirty: wash it, or send it back. A quicker sign: rub wet sand in your palm; dirty sand leaves a muddy stain.

24 h STRIKESCRATCHSOAK clear ringnail leaves no markgains ≤ 20% weight
4 · Bricks

Ring, scratch, soak

Strike two bricks together: a clear metallic ring means well burnt; a dull thud means under-burnt. A fingernail should leave no mark. For a big order, weigh one dry, soak it a day, weigh again: IS 1077 allows no more than 20% gain for common bricks. More: checking brick quality.

Questions people ask us

Short answers

What is the balu rate in Muzaffarpur today? (balu ka rate kya hai abhi)

It is on the rate board at the top of this page, per cft and per trolley, with the date it was set. The store sets it each morning. For the final amount with delivery to your village or mohalla, send your location on WhatsApp.

How many cft in one trolley of balu?

A tractor trolley load is usually about 100 cft, which is also 1 brass. Trolleys are not all one size, so measure: length × width × height in feet, inside the walls, after levelling the heap. The trolley check does the sum for you.

Why does balu get costlier before June?

River sand mining in Bihar stops every year from 15 June to 15 October. Builders stock up in the weeks before, and the rate climbs. In May 2026 Patna Press reported a 100 cft trolley going from ₹5,000–5,500 to ₹7,000–8,000 within about 15 days. Buy what you need for the monsoon in April or May.

Does gitti also stop in the rains?

No. Gitti is crushed quarry stone, not river material, so the river ban doesn't apply. Its rate moves with transport costs and road conditions. In May 2026, when sand jumped, traders said gitti stayed steady.

Is GST charged on balu, gitti and eent?

Yes. Sand and stone chips carry 5%. Clay bricks stayed under a special scheme after the September 2025 GST changes: 12%, or 6% when the kiln takes no input credit. The rate is printed on our bill.

What is the gitti rate per tractor?

Gitti is priced per cft. Measure the trolley the same way as for sand (L × W × H) and multiply by the per-cft rate on the board. The trolley check works for gitti too: pick the size from the list.

Awal or doyam: which eent should I buy?

Awal for outside walls and for walls that carry the roof. Doyam can go in inside partitions and boundary walls that will be plastered. Check a few from the stack: clear ring, sharp edges, even colour.

How do I know the sand is legal?

Every load of sand on the road in Bihar needs an e-challan from the Mines and Geology Department. Ask the driver for it and check it on Khanan Soft by number or QR code.

Where the facts come from

  1. Patna Press, Bihar sees sharp rise in sand, cement and aluminium prices (18 May 2026): trolley "around 100 cubic feet", ₹5,000–5,500 → ₹7,000–8,000 in about 15 days, gitti steady, ban 15 June to 15 October.
  2. Patna Press, monsoon sand mining ban, 2026, and Down To Earth, sand mining ban extended till 15 October in Bihar (2023): yearly ban on river ghats, under conditions set by the state environment authority, now 15 June to 15 October.
  3. Bihar Minerals (Concession, Prevention of Illegal Mining, Transportation & Storage) Rules, 2019: movement of sand and other minor minerals under e-challan. Verification: Khanan Soft, Mines and Geology Department, Bihar.
  4. Business Standard, Bricks to continue under GST 2.0 special composition scheme at 12% (18 Sep 2025). Sand (HSN 2505) and crushed stone (HSN 2517) at 5%: Tally HSN and GST guide.
  5. Bureau of Indian Standards: IS 456:2000 (clause 5.3.3, 20 mm aggregate for most reinforced concrete), IS 383:2016 (10, 20 and 40 mm graded aggregate), IS 1077:1992 (common burnt clay bricks; water absorption not more than 20% by weight for the common classes).
  6. Silt jar test, ring and scratch tests, sand and brick names, kiln season and trolley size: usual site practice in North Bihar, labelled as such on the page.

Send us your site and what you're building

We'll send back today's final rate for balu, gitti and eent with delivery, on WhatsApp.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com