1PCC under footing and floor: 40 mm gitti, lal balu, cement
2Floor filling: local balu
3Slab, beam, column: 20 mm gitti, lal balu, cement, steel
4Wall that carries load or faces outside: awal eent
5Plaster: clean, sieved lal balu and cement
Three materials, three jobs
What each one is, and which kind to ask for
All three can come on the same trip as your cement: one order, one GST bill.
Balu (sand)
Mixed with cement for concrete, plaster and mortar. Also fills under floors.
Lal balu: coarse, reddish, gritty between the fingers. Dhalai, columns, beams, PCC, and plaster once sieved. In UP the coarse sand is called morang; same job.
Local balu: fine and pale, from nearby rivers. For filling under floors. Some masons put it in brickwork mortar. Never use it alone in concrete.
Plaster wants sand without clay. Sieve it on site (usual practice in North Bihar).
For walls. The class decides where a brick can go.
Awal (first class): even red colour, sharp straight edges, clear ring when struck. Outside walls and walls that carry the roof.
Doyam (second class): patchy colour, some chipped corners. Inside partitions and boundary walls that will be plastered.
Jhama: over-burnt, dark, often bent. Used broken for soling under floors.
Size: IS 1077 gives a modular brick of 190 × 90 × 90 mm; older kiln bricks are about 9 × 4½ × 3 inch. Sizes vary by kiln, so measure a few from the stack.
Quoted per 1,000. Billed per piece. Class names are local usage.
Inside the walls, in feet. If the heap is rounded, level it, or take the height at the four corners and the middle and use the average. A truck is measured the same way. 100 cft is 1 brass; 1 m³ is 35.3 cft.
Material
Counted in
Quoted as
GST
Balu
cft
per trolley and per cftBilled per cft
5%
Gitti
cft
per cft"Per tractor" means: measure the trolley, multiply by the per-cft rate
5%
Eent
pieces
per 1,000Billed per piece
12% or 6%
Bricks and GST. After the September 2025 GST changes, bricks stayed under a special scheme: 12%, or 6% when the kiln takes no input credit (Business Standard, 18 Sep 2025). Some sites list 5% for bricks outside the scheme; the makers of those lists disagree, so budget for 12%. The rate that applies is printed on your bill.
Delivery is charged separately, by distance. Ask for the amount for your site: delivery and transport. How a trolley is counted, with tractor and truck: cft in a trolley.
Why the rate moves
The calendar sets the price
One year, three materials
Ban dates: 15 June to 15 October. Kiln months are usual practice; kilns differ.
Balu comes out of rivers
River sand mining in Bihar stops every year from 15 June to 15 October. Only stock already lifted can be sold. In May 2026 Patna Press reported a 100 cft trolley going from Rs 5,000 to 5,500 up to Rs 7,000 to 8,000 in about 15 days.
Gitti comes from quarries
Crushed rock is not river material, so the ban does not stop it. When sand jumped in May 2026, traders told Patna Press gitti had stayed steady. Diesel, distance and rains move it.
Eent comes from kilns
Kilns mould and fire in the dry months. In the rains they usually stop and bricks are sold from the stack. If you plan to build walls in the monsoon, book bricks before it.
Building after June? Buy the sand for your slab and plaster in April or May and stack it on a raised, covered spot so rain does not wash out the fine part. More: the yearly mining ban and today's rate.
Match the material to the job
Which one goes where
Work
Ask for
Why
PCC under footings and floors
40 mm gitti, lal balu
No bars to get past, so the big stone is fine
Slab, beam, column, lintel
20 mm gitti, lal balu
Reinforced concrete: IS 456 allows 20 mm for most of it
Thin precast: covers, jaali
10 mm gitti
Small sections need small stone
Plaster
Clean lal balu, sieved
Clay in the sand weakens the plaster
Filling under a floor
Local balu
Fine sand packs well and costs no strength
Outside and load-bearing walls
Awal eent
Even burning, straight edges, lays true
Inside partitions, boundary walls
Doyam eent
They get plastered anyway
Soling under floors
Broken jhama
Hard enough for a base layer
Work out the quantity first, then ask for the rate
Ordering by the trolley without a number is how sites end up with heaps left over, or a slab stopped halfway for one more load.
If something is wrong, it goes back on the same trolley.
1 · Quantity
Measure the trolley
Length, width and load height inside the walls. A load well short of what you paid for goes back or gets topped up.
2 · Paper
Ask for the e-challan
In Bihar every load of sand on the road needs one from the Mines and Geology Department. Check the number or QR on Khanan Soft. Sand without one can be seized.
3 · Sand
Jar test for mud
Fill a jar with sand and water, shake, leave. If the mud layer on top is more than about 8% of the sand below, wash it or send it back.
4 · Bricks
Ring, scratch, soak
A ring when two are struck means well burnt; a thud means under-burnt. For a big order, soak one for a day: IS 1077 allows no more than 20% weight gain in common bricks.
Anything here, in any quantity, can be ordered with us. Ask on WhatsApp for the time it takes. Today's amounts: balu, gitti and eent rate.
Questions people ask us
Short answers
What is the balu rate in Muzaffarpur today?
It is on the Tashya rate board, per cft and per trolley, with the date it was set. The store sets it each morning. For the final amount with delivery to your village or mohalla, send your location on WhatsApp.
How many cft in one trolley of balu?
A tractor trolley load is usually about 100 cft, which is also 1 brass. Trolleys are not all one size, so measure inside the walls: length × width × height in feet, after levelling the heap. This is usual practice, and Patna Press also describes a trolley load as around 100 cubic feet.
Why does balu cost more before June?
River sand mining in Bihar stops every year from 15 June to 15 October. Builders stock up in the weeks before and the rate climbs. In May 2026 Patna Press reported a 100 cft trolley going from Rs 5,000 to 5,500 up to Rs 7,000 to 8,000 in about 15 days. Buy the sand for slab and plaster in April or May.
Does gitti also stop in the rains?
No. Gitti is crushed quarry stone, not river material, so the river ban does not apply to it. Its rate moves with diesel, distance from the crusher and road conditions.
Is GST charged on balu, gitti and eent?
Yes. Sand and stone chips carry 5%. Bricks stayed under a special scheme after the September 2025 GST changes: 12%, or 6% when the kiln takes no input credit. Some websites list 5% for bricks, so budget for 12%. The bill shows the rate that applies.
Awal or doyam: which eent should I buy?
Awal for outside walls and walls that carry the roof. Doyam can go in inside partitions and boundary walls that will be plastered. Check a few from the stack: clear ring, sharp edges, even colour.
Arun Tiwari
Experienced thekedar, Tashya Ventures
Thekedar at our Reva Road store, Muzaffarpur, for costs, site questions and local supply. The figures on this page come from the sources below. Where a figure is usual site practice, the page says so, and where sources disagree it gives the safer one.
Bureau of Indian Standards: IS 456:2000 (20 mm aggregate for most reinforced concrete), IS 383:2016 (10, 20 and 40 mm graded aggregate), IS 1077:1992 (common burnt clay bricks: modular size, water absorption not above 20% for common classes).
Trolley size, the jar, ring and scratch tests, brick class names and kiln months: usual site practice in North Bihar, labelled as such on the page.
Send us your site and what you are building
We will send back today's final rate for balu, gitti and eent with delivery, on WhatsApp.