How much balu and gitti a 1000 sq ft house takes: stage by stage, in cft and trolleys

The short answer
1,575 cft
BaluAbout 16 trolleys of 100 cft, for one storey with brick walls and an RCC roof.
1,090 cft
GittiAbout 11 trolleys. About 610 cft if the foundation bed and floor PCC use jhama.
+2,250
Plinth filling, cftFor a 2.5 ft plinth. Counted apart; often the biggest heap on site.

This is the same house as on our cement for 1000 sq ft page, with 96 bags in the 5-inch M20 roof slab. Add about 5% for loss on site. These are planning figures to budget and to order stage by stage. They are not a bill of quantities; your drawing decides.

One house, counted in trolleys
Trolleys of balu, gitti and filling for a 1000 sq ft houseEach trolley icon is 100 cft. Balu about 1,575 cft, about 16 trolleys. Gitti about 1,090 cft, about 11 trolleys, of which about 480 cft can be jhama ballast. Plinth filling for a 2.5 ft plinth about 2,250 cft, about 22 trolleys, more than either.Balu≈ 1,575 cftGitti≈ 1,090 cftPlinth filling≈ 2,250 cftNeev, plinthWallsRoofPlasterFloorCan be jhamaOne trolley icon = 100 cft. Filling: 2.5 ft plinth, balu or mitti.
One storey, 40 × 25 ft, 9-inch brick walls, 5-inch RCC roof, tiled floor. Colours show the stage each trolley goes to. Sand and gitti are counted dry and loose, the way they are sold.
First question

What carries your roof sets the range

The cft-per-sq-ft rules builders use, and what our worked house comes to. Count the built-up area of every floor; what "1000 sq ft" means is explained on the cement page.

Brick walls carry the roof

The usual one-storey Bihar house: 9-inch walls, an RCC slab, a plinth band and a lintel band.

1,300–1,800 cft balu1.3 to 1.8 cft per sq ft · our house: about 1,575
600–1,100 cft gitti0.6 to 0.9 cft per sq ft with jhama in the PCC, up to 1.1 with stone · ours: 610 or 1,090

Columns and beams carry it

Column footings, columns and beams at plinth and roof are extra concrete, so gitti goes up most. The walls are still there.

1,200–1,800 cft balu1.2 to 1.8 cft per sq ft · our house as a frame: about 1,730
1,000–1,350 cft gitti1.0 to 1.35 cft per sq ft · ours as a frame: about 1,400 with stone PCC

Plinth filling is outside all of these. The per-sq-ft rules are standard planning figures, the same ones our house construction cost calculator uses.

Where it goes

One worked house, stage by stage

Every lot below comes from the cement count of the same house, turned into balu and gitti by its mix. The table also says when each lot should reach the site.

Section through an outside wall
Where the balu and gitti go in a one-storey houseSection through an outside wall of the worked house, numbered from the foundation bed up to the parapet, with the balu and gitti each part takes.groundfloor level12345678910111PCC bed under footingbalu 133 · gitti 266 (40 mm)2Brick footing + plinth wallbalu 3173Plinth bandbalu 30 · gitti 594Plinth filling2,250 cft, counted apart5Floor PCC + tile bedbalu 172 · gitti 2176Walls, 9″ and 4.5″balu 3277Lintel band + chhajjabalu 42 · gitti 858Roof slab, 5″, M20balu 177 · gitti 3549Parapet + stairbalu 53 · gitti 3710Plaster, all facesbalu 28511Plinth protectionbalu 37 · gitti 74concretefilling
Not to scale. Figures are cft for the whole house, dry and loose. The worked house: 40 × 25 ft, footing 3 ft deep, plinth 2.5 ft, 10 ft walls, 3 ft parapet.
Stage and what goes in itBaluGittiTrolleys, when
1 · Neev and plinthPCC bed 6″, 1:4:8 · brick footing and plinth wall, 1:6 · plinth band 6″, M204803255 balu + 3½ gittiGitti and balu for the PCC bed before the digging ends; the rest as the footing rises.
2 · Walls up to the roof9″ and 4.5″ brickwork · lintel band · chhajjas370854 balu + 1 gittiIn lots as the walls rise. The gitti a day before the lintel band.
3 · RoofSlab 5″, M20, 96 bags · stair · parapet2303912½ balu + 4 gittiAll the slab's 177 balu and 354 gitti on site two days before the dhalai. A slab is poured in one go.
4 · PlasterInside 12 mm 1:6 · outside 18 mm 1:4 · ceiling 8 mm 1:3285—3 baluRoom by room, sieved lal balu. Keep a little extra for uneven walls.
5 · FloorPCC 3″, 1:4:8 · tile bed 20 mm, 1:4 · plinth protection outside2092902 balu + 3 gittiAfter the filling has settled, before tiling.
Whole houseAdd about 5% for loss: about 1,650 cft balu and 1,145 cft gitti to plan for.1,5741,09116 + 11
Plinth fillingBetween the plinth walls, after the plinth band, before the floor PCC2,250—22–23Local balu or good soil. Below.
Turning any cement count into balu and gitti One 50 kg bag is about 1.23 cft of cement. Multiply by the parts of the mix:
  1. M20 concrete, 1:1.5:3: balu = 1.5 × cement cft, gitti = 3 ×.
  2. PCC 1:4:8: balu 4 ×, gitti 8 ×. Brick mortar 1:6: balu 6 ×. Plaster 1:4: balu 4 ×.
Slab: 96 bags × 1.23 = 118 cft cement → balu 118 × 1.5 = 177 cft · gitti 118 × 3 = 354 cft

The bag counts for each stage, and why the slab is 96 bags, are on cement for 1000 sq ft and cement for a chhat dhalai. For one part of your own drawing, use the cement, sand and gitti calculator.

The heap nobody counts

Plinth filling can be more than all the other balu put together

Online counts for "sand for 1000 sq ft" leave the filling out. In Muzaffarpur, where houses sit on raised plinths, it is often the biggest order on the site.

1How much

About 90% of the floor area × the plinth height. The walls take the other tenth. Standard planning figure, for 1000 sq ft:

1.5 ft plinth1,350 cft
2 ft1,800 cft
2.5 ft2,250 cft
3 ft2,700 cft
4 ft3,600 cft

2What with

Fine local balu or good soil from the site. Not lal balu: that is money spent where no strength is needed. Usual practice is layers of about 6 inches, each watered and rammed, so the floor does not sink and crack later. Which fill, and how: plinth bharai, balu or mitti.

3Buying less of it

Soil dug out of the footing trenches goes back in, so you buy less than the table. Fill settles when watered, so order about a tenth more than the space (usual practice). A higher plinth for floods adds 900 cft for every foot: how high in a flood area.

Anti-termite treatment goes into the soil before and during the filling, not after the floor is laid: termite treatment.

Which balu, which gitti

More than half the balu must be coarse; most PCC can take jhama

Order by kind, not just by cft. Fine sand in a slab weakens it; lal balu in the filling wastes money.

The same house, by kind
Which kind of balu and gitti the house takesCoarse lal balu 895 cft for concrete, plaster and tile bed. Mortar sand 679 cft for brickwork. Gitti 1,091 cft: 535 of 20 mm, 556 of 40 mm or jhama. Filling 2,250 cft.Lal balu, coarse895 cftall concrete, plaster, tile bedconcrete 546plaster 349Sand for brick mortar679 cftclean local balu will do; lal is saferbrickwork 679Gitti1,091 cft20 mm in RCC; 40 mm or jhama in PCC20 mm 53540 mm / jhama 556Plinth filling2,250 cftlocal balu or mitti, 2.5 ft plinthfilling 2,250 (bar cut short)
Worked house, cft, dry and loose. Grains and how to check them: balu.

Lal balu · about 895 cft

Coarse sand for every concrete (PCC, bands, slab, stair, floor) and, sieved, for plaster and the tile bed. This is the sand to book early. Which grain for plaster and which for dhalai: kaun si balu.

Mortar sand · about 679 cft

For brickwork. Sand for masonry mortar has its own standard (IS 2116), apart from concrete sand, and may be finer. Clean local balu does the job; lal balu is the safer choice for the footing. Never fine sand in concrete.

Gitti 20 mm · about 535 cft

Slab, plinth and lintel bands, chhajjas, stair: everything with sariya in it. Stone gitti only; RCC takes no brick ballast. More on sizes: gitti.

Gitti 40 mm or jhama · about 556 cft

The PCC bed under the footing and the floor PCC. Many Bihar sites use jhama, broken over-burnt brick, here; CPWD's specification allows 40 mm brick aggregate from well-burnt or over-burnt brick. That takes about 480 cft off the stone gitti.

Same size, different count

Why the internet says 1,200 cft and we say 1,575

Nobody is cheating. Each of these moves the count, and the last three are where cft go missing after you have paid.

The brickwork below the floor

Often left out: about 317 cft

The brick footing and the plinth wall sit underground and inside the plinth. A count that starts at floor level misses them. Ours includes them.

Uneven walls, thicker plaster

Plaster can take half as much again

Our 285 cft is the straight arithmetic. UltraTech's own plaster figure is well above it because real brick faces are not flat (worked out on the cement page). Straight brickwork saves plaster sand.

Stone or jhama in the PCC

Moves gitti by about 480 cft

Ask the thekedar which he plans before comparing gitti figures. One count with jhama and one without can both be right.

Wet sand looks like more

15–30% more volume when damp

Damp sand swells, which engineers call bulking. A wet trolley holds less real sand, and a ghamela-measured mix with wet sand ends up short of sand. How to allow for it: geeli balu.

The trolley was not 100 cft

Measure level, not the heap

100 cft is the usual count, but trolleys differ. Length × width × level height, in feet, and pay per cft: how many cft in a trolley.

Lost on site

5% on a tidy site, more on a messy one

A heap on mud loses its bottom layer. Rain washes sand into the drain. Loose heaps by the road walk away at night. That is why we say order by stage.

Ordering and storing

Order by stage, not 27 trolleys on day one

Keeping balu and gitti on siteSand heap on a plastic sheet inside a ring of bricks, covered with a weighted tarpaulin. Gitti on a separate hard base.Tarpaulin, weighed downGitti on its own baseSheet or brick floorBrick kerbHard base, never mudAway from the drain and the road edge.A heap the rain reaches is a heap you pay for twice.
Usual practice on a good site. Gitti does not wash away, but it sinks into mud and comes back dirty.
  • Each stage, its own lot. The table above says how many trolleys and when. Sand that sits for months gets wet, dirty and stolen.
  • The slab is the exception. Its balu, gitti and cement must all be on site before the dhalai starts; the pour cannot stop halfway. Checklist: chhat dhalai checklist.
  • Mind 15 June. River sand mining in Bihar stops from 15 June to 15 October, and the rate climbs before it. If your slab or plaster falls in the rains, book that stage's balu by early May: why June matters.
  • Check every trolley before it is tipped: measure it, squeeze a handful for wetness, jar-test for mud. Three checks, five minutes: checks at the trolley.
  • Bill and delivery. Balu and gitti are billed per cft with 5% GST on the bill. Delivery is charged separately, by distance; ask for the amount for your site: delivery. Today's rate per cft: balu, gitti, eent rate.
Your house

A planning count of balu and gitti for your house

Put in your area, floors, slab and plinth. It scales the worked house above and works the slab and filling out exactly. For one part of the drawing, use the full calculator.

Slab at M20 (1:1.5:3). Plinth height is above ground, to floor level. 5% for loss is added to balu and gitti.

Your count

Lal balu, coarse—Concrete, plaster, tile bed
Mortar sand—Brickwork
Gitti 20 mm—Slab, bands, stair
Gitti 40 mm—PCC under footing, floor PCC, plinth protection
Jhama (brick ballast)—PCC under footing and floor
Plinth filling—Local balu or soil, ground floor only
Material totalAsk rate
Send this count on WhatsApp

Planning figures, not a bill of quantities. Prices are filled in from today's rate per cft. Delivery is charged separately; ask for the amount for your site (delivery). Cement for the same house: cement count.

The rest of the same house: cement for 1000 sq ft · sariya kitna lagega · bricks for 1000 sq ft · the whole budget: cost of a 1000 sq ft house.

On our counter for this house

One order, one bill, stage by stage

We sell genuine material with a GST bill: 5% on sand and gitti. Anything not on the shelf, we can order for you; ask on WhatsApp for the time it takes. Today's prices: balu, gitti, eent rate · cement rate.

Questions people ask us

Short answers

How much sand for a 1000 sq ft house? (1000 sq ft mein kitni balu)

For one storey with brick walls and an RCC roof, about 1,575 cft of balu, about 16 trolleys of 100 cft, before the plinth filling. The planning range is 1,300 to 1,800 cft. Add about 5% for loss on site.

How much gitti (aggregate) for a 1000 sq ft house?

About 1,090 cft if every concrete uses stone gitti: about 535 cft of 20 mm and 556 cft of 40 mm. With jhama in the foundation bed and floor PCC, stone gitti drops to about 610 cft. An RCC frame house takes 1,000 to 1,350 cft.

How many trolleys of balu in all?

About 16 to 17 trolleys of 100 cft for the house, with loss. Then the plinth filling: about 13½ trolleys for a 1.5 ft plinth, 22½ for 2.5 ft and 27 for 3 ft, less whatever soil from the trenches goes back in.

Balu and gitti for a 1000 sq ft slab?

A 5-inch M20 slab: about 96 bags of cement, 177 cft of balu and 354 cft of gitti, so about 2 trolleys of balu and 3½ of gitti. 4-inch: 77 bags, 142 cft balu, 284 cft gitti. 6-inch: 115 bags, 212 cft balu, 424 cft gitti. The rest of the dhalai order: chhat dhalai cement.

How much sand for 1000 sq ft of plaster?

By the arithmetic, about 45 cft for 12 mm inside plaster at 1:6, and about 63 cft for 18 mm outside plaster at 1:4. Uneven brick walls can take half as much again.

Does a G+1 house take double?

No. With 1000 sq ft on each floor, about 2,520 cft of balu and 1,570 cft of gitti, because the foundation, plinth and ground floor PCC are made once, and the filling does not grow. The engineer makes the foundation bigger for two floors, so plan near the top of the range.

Can jhama go in the slab or beams?

No. Jhama is for the PCC bed and the floor PCC only. Anything with sariya in it takes stone gitti, usually 20 mm.

How many cubic metres is that?

One cubic metre is about 35.3 cft, so a 100 cft trolley is about 2.83 m³. The house's 1,575 cft of balu is about 45 m³; its 1,090 cft of gitti is about 31 m³.

Is GST charged on balu and gitti?

Yes, 5% on both, shown on the bill with the cft and the rate.

Abhishek Ranjan
Diploma Civil Engineer, Tashya Ventures

Civil engineer at our Reva Road store, Muzaffarpur. He worked the balu and gitti out of the same house as our cement page on 13 Nov 2026, using UltraTech's mix figures and standard estimating figures. Where the figures disagree, the page says so and uses the safer one.

Where the numbers come from

  1. UltraTech, M20 concrete ratio and mix calculation: 1:1.5:3, dry volume 1.54 m³ per m³, cement 1,440 kg/m³ (so a 50 kg bag is about 1.23 cft).
  2. Our worked house: stage bag counts from cement for 1000 sq ft; slab 77, 96 and 115 bags for 4, 5 and 6 inch at M20, as on cement for chhat dhalai.
  3. Infralens, material quantities per unit of work: M20 takes 0.42 m³ sand and 0.84 m³ coarse aggregate per m³, the same proportions as ours.
  4. BIS: IS 383 (aggregates for concrete), IS 2116 (sand for masonry mortars), IS 456 (M20 the lowest grade for reinforced concrete).
  5. CPWD Specifications, concrete work: brick aggregate of 40 mm nominal size, from well-burnt or over-burnt brick or brick bats, for cement concrete.
  6. Bulking of sand: The Constructor, 15–30% extra volume at about 4% moisture.
  7. Patna Press, Bihar sand, cement and aluminium price rise (18 May 2026): river sand mining stopped 15 June to 15 October.
  8. Other published counts, compared on this page: HouseYog, sand for a 1000 sq ft house (1,100–1,250 cft) and aggregate for house construction (700–900 cft).
  9. Standard planning figures: balu and gitti per sq ft by house type, filling at 90% of floor area × plinth height, 1.33 dry factor for mortar, 100 cft trolley (usual practice). GST 5% on sand and gitti.

Send us your plan

We'll count the balu and gitti for each stage, with today's rate per cft and the delivery charge, on WhatsApp. Send photos of the sariya before dhalai and we'll look at them with you.

TASHYABUILDING SOLUTIONS · MUZAFFARPUR
WhatsApp 90310 74624tashyaventures.com