The short answer
3.5–5 kg of sariya for every sq ft of built-up area

That is JSW's published thumb rule for an RCC-framed house. Built-up area means every floor added together, not the plot. Use it to budget. Order from your engineer's bar bending schedule, one stage at a time.

35–50 q
For 1000 sq ft3,500 to 5,000 kg. A single-storey house sits towards the lower end.
×2
For G+1Two floors of 1000 sq ft are 2000 sq ft: 70 to 100 quintal.
4 orders
Not oneNeev, column, lintel, chhat. Buy each when that stage starts.
Where the sariya goes in a house
Steel inside a single-storey RCC house A house cut open. Stage 1, neev: footings with a steel mesh and the plinth beam, about 25 percent of the steel. Stage 2: columns with main bars and rings, about 20 percent. Stage 3: lintel band over doors and windows, about 10 percent. Stage 4, chhat dhalai: roof beams, slab mesh and chhajja, about 45 percent. Bars left standing above the roof for a future floor. GROUND 4 3 2 1 1 Starter bars Chhat dhalai Lintel band Columns Plinth beam Footings for a floor added later roof beams, slab mesh, chhajja, stairs over doors and windows main bars + 8 mm rings ties the columns at plinth mesh + column bars about 45% about 10% about 20% neev, with footings: about 25%
Single-storey RCC house, not to scale. The shares are the usual split for planning, not a maker's figure; your engineer's bar bending schedule gives the real one.
By house size

Sariya for your built-up area, in kg and quintal

Same rule, 3.5 to 5 kg per sq ft, for each size. JSW's own table runs 500 to 2,500 sq ft; we added 300 and 800 because many houses here are that size.

Steel range by built-up area Bars from 3.5 to 5 kg per square foot. 300 square feet: 1.05 to 1.5 tonnes. 500: 1.75 to 2.5. 800: 2.8 to 4. 1000: 3.5 to 5. 1500: 5.25 to 7.5. 2000: 7 to 10. 2500: 8.75 to 12.5 tonnes. 02.5 t5 t7.5 t10 t12.5 t 300 sq ft500 sq ft800 sq ft1000 sq ft1500 sq ft2000 sq ft2500 sq ft 10.5–15 q17.5–25 q28–40 q35–50 q52.5–75 q70–100 q87.5–125 q 1.05–1.5 t1.75–2.5 t2.8–4 t3.5–5 t5.25–7.5 t7–10 t8.75–12.5 t
t = tonne (1,000 kg), q = quintal (100 kg). Left end of each bar is 3.5 kg per sq ft, right end is 5 (JSW).
Built-up area, not plot area
How to count built-up area A 1,200 square foot plot with a 900 square foot house. The house has two floors of 900 square feet, so the built-up area is 1,800 square feet, not 1,200. PLOT 1,200 sq ft House 900 sq ft open space First floor900 sq ft Ground floor900 sq ft 900 + 900 = 1,800 sq ft built-up × 3.5–5 kg = 6,300–9,000 kg, not 4,200–6,000
Money, roughly. Multiply the kg by today's rate per kg on the sariya rate page; 12 mm Tata Tiscon is Ask rate per kg today. Cutting and delivery are charged separately; ask for the amount for your site (delivery).
Why the range is wide

Why one house needs 3.5 kg a sq ft and another needs 5

Two houses of the same size can differ by a tonne and a half. These are the things that move your number, so you know which end to budget for.

+More floors

Every floor above presses on the columns and footings below, so those get heavier. A single storey sits towards 3.5; G+1 and G+2 move towards 5.

+Big rooms, long spans

A 16-foot hall needs deeper beams and more slab steel than a 10-foot room. Balconies and chhajjas that hang out also add steel.

+Soft or filled soil

Footings get wider on weak ground, as on low-lying plots filled with earth. Your engineer sizes them after seeing the soil.

+A floor to come later

If you will add a floor in five years, the footings and columns must be built for it now. It costs more steel today and saves breaking things later.

Frame house or brick-wall house
RCC frame house compared with a load-bearing brick house Left: in an RCC frame house the footings, columns, beams and slab all carry steel and the walls only fill the gaps. Right: in a brick-wall house the walls carry the load and steel goes into the plinth band, lintel band and roof slab. walls only fill the gaps slab RCC frame columns and beams carry it Brick walls carry it steel in bands and slab only 3.5–5 kg / sq ft (JSW) far less: ask your engineer lintel bandplinth band red = where the steel is
The rule of 3.5–5 kg is for a frame house. In a brick-wall house most of the steel goes into the slab and the bands, so the total is much lower. No steel maker publishes a figure for it; building websites quote around 2.5–3 kg per sq ft. Treat that as a guess and take the list from your engineer. Doing such a house right: the village house, brick walls with an RCC slab.

The one saving we never suggest: cutting steel below the drawing. North Bihar is a high earthquake zone, and the rings and bars are what hold a frame together when the ground shakes. Why: earthquake zone and your house · why rings matter.

What to buy now

Buy by stage: neev, column, lintel, chhat

Most families here build in instalments, so there is no need to buy 4 tonnes on day one. Steel left out through a monsoon rusts, and the rate moves between stages. Here is the 1000 sq ft single-storey house, split the usual way.

Steel for a 1000 square foot single-storey house, stage by stage Stage 1, neev: 875 to 1,250 kilograms. Stage 2, columns: 700 to 1,000. Stage 3, lintel: 350 to 500. Stage 4, chhat dhalai: 1,575 to 2,250. Then, later, the next floor from the bars left standing. Weeks or months pass between stages. 1 · 25% 2 · 20% 3 4 · chhat 45% share of the house's steel (usual split) 1234+ NeevColumnsLintelChhat dhalaiNext floor, later 875–1,250 kg700–1,000 kg350–500 kg1,575–2,250 kg footing mesh, column starter bars, plinth beam bars and rings sizes as drawn: 10, 12 or 16 mm + 8 mm order when digging starts column bars up to the roof, and the rings: many 8 mm pieces count rings from the drawing lintel band or lintels over openings, chhajja bars if cast with it usually 10 or 12 mm + 8 mm rings roof beams and slab, poured the same day, plus stairs and chhajja slab mesh 10 and 12 mm; binding wire send photos before dhalai: we look at them with you on WhatsApp bars left standing above the roof, coated with cement slurry against rust 9–12.5 q7–10 q3.5–5 q16–22.5 q weeks to monthsweeksweeks
StageOrder now1000 sq ft
1 · Neevfootings + plinth beamFooting mesh, column starter bars, plinth beam bars, ringsStarter bars must be long enough to lap with the column bars: lap length875–1,250 kg
2 · Columnsground to roofColumn main bars, 8 mm ringsRings are counted per column from the spacing in the drawing, closer near beams700–1,000 kg
3 · Lintelover doors and windowsBand or lintel bars, rings, chhajja barsSome houses cast chhajjas with the roof instead350–500 kg
4 · Chhatthe biggest orderRoof beam bars, slab mesh, stair bars, binding wireSlab detail: chhat mein kitna sariya · which mm1,575–2,250 kg
Total3.5–5 kg × 1000 sq ftPlus laps and cut pieces, which the bar bending schedule already counts3,500–5,000 kg
The split is the usual one, not your drawing. Shares vary with the design: a house with heavy footings on soft soil spends more at neev, a house with long spans more at chhat. Before each stage, ask your engineer for that stage's bar bending schedule (what a bar bending schedule is) and send it to us on WhatsApp. Keep delivered steel off the ground and covered: storing sariya in rain and fog.
Which bar where

Bar sizes by part of the house, and what one bar weighs

Sariya is billed by the kg, but it arrives as 12-metre bars. These two tables let you go from the drawing to pieces to kg.

Which size goes where

JSW's list. Your drawing decides.
PartUsual size
Rings (stirrups)hold main bars, resist shear8 mm
Roof slabspreads load across the room10, 12 mm
Columns, beams, footingswhere the design needs heavier steel16, 20 mm +
Small single-storey houses are often drawn with 12 mm in columns and footings, and some drawings use 6 mm rings. Both are fine when the engineer has drawn them; never go thinner than the drawing.

Standard weight per metre

IS 1786 figures (D² ÷ 162). One bar = 12 m.
Sizekg / mOne barBars in 1 q
6 mm0.2222.66 kgabout 38
8 mm0.3954.74 kgabout 21
10 mm0.6177.40 kgabout 13.5
12 mm0.88810.66 kgabout 9.4
16 mm1.5818.96 kgabout 5.3
20 mm2.4729.64 kgabout 3.4
Weighed bars can differ slightly from these; the bill goes by the weighed kg. More: weight per metre · bars in a bundle.
Costly mistakes

Six ways people get the sariya wrong

Each one either wastes money or takes strength out of the house. All six are common, and all are easy to avoid.

plot 1,200 sq ft 900900 = 1,800 sq ft

Working from the plot size

Result: half the steel you need, on paper

The rule is per sq ft of built-up area: every covered floor added together. Open space doesn't count; each upper floor does.

10 mm8 mm as drawn: 78.5 mm²swapped: 50.3 mm²

A thinner bar than the drawing

Result: 36% less steel where it was drawn

Strength goes with the bar's cross-section, which falls faster than the diameter. 8 mm in place of 10 mm, or 10 in place of 12, is not a small saving. It is a weaker slab.

100 pieces · 12 mm100 pieces · 10 mm 1,066 kg740 kg same count, 326 kg apart

Counting pieces instead of kg

Result: quotes you can't compare

"100 pieces" means nothing without the size. The bill is in kg; ask for the weight and check it at delivery against the standard weight per metre: checks when sariya arrives.

Buying it all at once

Result: rust, theft, and last month's rate

Steel bought for the chhat in the week of the neev can sit for months. Light surface rust is normal; flaking rust is not. Buy each stage when it starts, keep it on wooden blocks, covered.

rings skippedcloser near the beam

Fewer rings to save steel

Result: columns that burst in an earthquake

Rings are cheap 8 mm bar, but they keep the column's main bars from buckling. The drawing sets the spacing, closer near beams and footings. Read: why rings matter.

cut flushno way upleft standingslurry-coated

No plan for the next floor

Result: breaking the roof to add a floor

If a floor may come later, the columns and footings are built for it and the column bars are left standing above the roof, coated with cement slurry. Plan: ground floor now, upper floor later.

Your house

Rough sariya for your house, and for the stage you are at

Any size works, even a 200 sq ft room. This gives the budget range; sizes, bundles and today's price are in the sariya calculator.

Built-up area: — sq ft (all floors added)

Your rough figure

Whole house—3.5–5 kg per sq ft of built-up area (JSW)—
This stage—usual split for planning; your engineer's schedule gives the real figure
Cost at today's rateAsk rate
Send this on WhatsApp

A budget range, not an order list. Send your engineer's bar bending schedule with it and we'll reply with sizes, kg and today's price. Cutting and delivery are charged separately. Prices: sariya rates.

Questions people ask us

Short answers

How much sariya for a 1000 sq ft house? (1000 sq ft mein kitna sariya)

About 3,500 to 5,000 kg, which is 35 to 50 quintal, for an RCC-framed house with 1000 sq ft of built-up area. That is JSW's thumb rule of 3.5 to 5 kg per sq ft. A single-storey house usually sits towards the lower end. The final figure comes from your engineer's bar bending schedule.

How many kg of sariya per sq ft?

3.5 to 5 kg per sq ft of built-up area, counting every floor, for a frame house. It is a budgeting figure, not an order list.

1000 sq ft per floor, G+1: how much?

Count both floors: 2000 sq ft built-up, so 7,000 to 10,000 kg (70 to 100 quintal). Buy it floor by floor and stage by stage, not in one go.

How much for 1500 sq ft?

5,250 to 7,500 kg, or about 52 to 75 quintal, by the same rule.

Sariya kitna lagega, kaise nikale? (How do I work it out?)

Add the covered area of all floors. Multiply by 3.5 and by 5. That range is your budget. Before each stage, get that stage's bar bending schedule from your engineer and order from it. The sariya calculator turns the range into sizes and today's price.

Which size goes in columns and which in rings?

JSW lists 8 mm for rings, 10 and 12 mm for slabs, and 16 mm and above for columns, beams and footings where the design needs heavier steel. Many small houses are drawn with 12 mm in columns. Go by the drawing, never thinner.

Why does a brick-wall house need less?

Its walls carry the load, so there are no columns and fewer beams; steel goes into the slab, the lintel band and the plinth band. No steel maker publishes a per-sq-ft figure for such houses, so take the quantity from your engineer.

Can I buy sariya stage by stage?

Yes, and it is better for a house built in instalments. Order neev steel first, then columns, then lintel, then chhat. Cutting and delivery are charged separately each time.

How many quintal is a tonne?

10 quintal = 1 tonne = 1,000 kg. So 3.5 to 5 tonnes is 35 to 50 quintal.

Abhishek Ranjan
Diploma Civil Engineer, Tashya Ventures

Looks after cement, steel and building questions at our Reva Road store, Muzaffarpur. The thumb rule and bar sizes on this page were checked against JSW's published guide, and the bar weights against IS 1786, on 12 Nov 2026. The stage split is the usual one for planning and is marked as such.

Where the numbers come from

  1. JSW Steel, How Much Steel is Required for a House? (18 Sep 2026): 3.5–5 kg per sq ft of built-up area, the table for 500–2,500 sq ft, bar sizes by use (8 mm rings; 10/12 mm slabs; 16, 20 mm and larger for columns, beams and foundations where the design needs it).
  2. Bureau of Indian Standards, IS 1786:2008, high-strength deformed steel bars: nominal mass per metre (0.222 kg for 6 mm to 2.47 kg for 20 mm), the standard weight per metre used here; D² ÷ 162 gives the same figures.
  3. Stage split (neev 25%, columns 20%, lintel 10%, chhat 45%): usual practice for planning a single-storey RCC house, not a maker's figure.
  4. Brick-wall houses: building websites quote around 2.5–3 kg per sq ft; no steel maker publishes a figure, so the page gives none of its own.