A wall longer than 8 m
IS 4326's band table stops at 8 m. Beyond that it asks for a pilaster or buttress to cut the span, or a special design.
Yes, it is a sound house. One or two storeys of 9-inch brick walls under an RCC lenter, with no columns, is allowed in Muzaffarpur's earthquake Zone IV. IS 4326, the code for this house, puts it in category D and asks for six things:
None of this needs costly material. A four-room house takes about 200 kg more of 6, 8 and 10 mm sariya and a dozen more bags of cement (calculator below). That is what keeps the walls from parting at the corners in a strong quake.
A brick wall is strong along its length and weak across it. In a quake each wall needs the walls at right angles to hold it up. Three things make that happen, and every rule on this page serves one of them.
A continuous concrete band at lintel level, and one on the plinth, holds every wall to its neighbours like a belt round a box. The Zone IV page shows why the lintel band is the one never to skip.
The strips of wall between doors and windows rock and crack in an X when the ground shakes. A vertical bar at each edge, anchored in the plinth and the lenter, makes them bend instead of break, and stops the wall sliding at sill or lintel level (IIT Kanpur–BMTPC Tip 15).
An RCC slab that sits on all the walls holds their tops together. That is why IS 4326 lets it replace the roof band, but only when it rests on the full wall, or at least three-quarters of it, and runs continuous over the inner walls.
Why category D: IS 4326 sorts houses by zone and importance. An ordinary house in Zone IV is category D, and for one or two storeys the code asks for the mortar, lintel band, vertical bars at corners, junctions and jambs, and a plinth band where the soil is soft. North Bihar's river silt is soft, so build the plinth band too.
Every opening takes strength out of a wall, and an opening near a corner cuts the link between two walls. IS 4326 gives exact limits for a Zone IV house. Draw them on your naksha before the mason sets the first door frame.
| Rule for a Zone IV house | Limit |
|---|---|
| Opening to inside corner of an outside wallIS 4326 Table 4: zero is allowed only in Zones II and below | ≥ 450 mm |
| All openings in one wall, added upShare of that wall's length, one-storey house | ≤ 50% |
| Same, two-storey houseEach floor's walls | ≤ 42% |
| Pier between two openingsThe strip of wall left standing | ≥ 560 mm |
| One opening above anotherVertical gap, two-storey house | ≥ 600 mm |
| Ventilator width | ≤ 900 mm |
Measure one wall from inside corner to inside corner and put in its openings. It tests the three limits above.
The plinth height and foundation type have their own pages; this is everything after the plinth level is fixed. Figures are IS 4326:1993 for category D unless marked.
Plinth height comes from the worst water on your plot plus 2 ft, and the footing from a test pit. Both are worked out on the flood-area plinth page. Set the corner and junction bars in the footing masonry now, before the plinth rises.
Plinth walls in cement mortar, the inside filled in thin rammed layers. On top, a concrete band the full width of the wall, made like the lintel band. IS 4326 asks for it where masonry footings sit on soft or uneven soil, and says it serves as the damp-proof course too. Add WP+200 at 200 ml per bag of cement, UltraTech's dose.
Use well-burnt awal eent, wetted before laying so they don't suck the mortar dry. Mortar 1:4 cement : sand, joints about 10 mm and full. Build each corner first, stepped back, up to about 600 mm and fill the wall between; or leave toothed joints in both walls in lifts of about 450 mm. Never raise one wall and butt the next against it.
As the wall rises, the 10 mm bars at corners, junctions and door and window sides stay in a pocket in the brickwork, filled with 1:3 cement mortar (at least 10 mm round the bar) or M15 concrete as you go. Corner bars run from the plinth into the lenter; jamb bars from the floor up into the lintel band.
Set all door and window tops at the same height so one band passes over all of them. Keep the limits in the table above. Where a wall must take a wide opening, the engineer frames it.
One continuous band over every load-bearing wall, inner cross walls included, at door-top level. Concrete M15 or 1:2:4, the full wall width, at least 75 mm deep. Two bars, one near each face, held by 6 mm links every 150 mm, with 20 mm cover. At corners and T-junctions the bars are bent round and lapped, never stopped short.
The slab sits across the whole 9-inch wall and runs unbroken over the inner walls; the corner bars end inside it. Done this way, IS 4326 needs no separate roof band. Thickness and slab steel: is a 4-inch lenter enough and sariya in the chhat; on the day: dhalai checklist; after: curing.
| Longest wall between cross walls | Band bars |
|---|---|
| Up to 5 m (16 ft) | 2 × 8 mm |
| 6 m (20 ft) | 2 × 10 mm |
| 7 m (23 ft) | 2 × 12 mm |
| 8 m (26 ft) | 4 × 10 mm |
| House | Vertical bar at each corner, junction and jamb |
|---|---|
| One storey | 10 mm |
| Two storeys, ground floor | 12 mm |
| Two storeys, upper floor | 10 mm |
IS 4326:1993 Tables 6 and 7, category D, for HSD (TMT) bars. Over 8 m, add a cross wall or pilaster. Your engineer's drawing is final.
A brick-wall house works when walls are short, cross walls come often and openings are small. These six situations break that, and each has a fix. Whether to go for an RCC frame for the whole house is weighed on the 1000 sq ft cost page.
IS 4326's band table stops at 8 m. Beyond that it asks for a pilaster or buttress to cut the span, or a special design.
An opening wider than the wall limits allow takes out the wall that was carrying the roof there. The code asks for it to be framed in concrete.
IS 4326 allows bearing walls up to four storeys, but only when walls, bars and footing are designed for them: two storeys need 12 mm bars below and openings within 42%. Some cement makers' guides ask for 12-inch walls for two storeys (JK Cement).
Walls on soft ground settle unevenly and crack whatever the bands. The NIDM guide for Bihar gives brick or RC piles with a beam on top for such plots.
Wings of different size shake differently and tear at the joint. IIT Kanpur's Tip 13 suggests splitting the plan into near-rectangular blocks unless the projection is small, about 15 to 20% of the length.
A long room needs a beam under the lenter, and a beam end puts a heavy point load on a small patch of brick.
Shops or parking on bare columns with walled rooms above is a different building altogether. Don't build it without an engineer's design: why the open ground floor fails.
Each picture shows the habit on the left (red is the mistake) and what a strong quake or a few monsoons do to it on the right. All six are free to avoid while the wall is going up.
The corner is where two walls hold each other up. An opening there cuts that link (IIT Kanpur–BMTPC Tip 13). Keep 450 mm of solid wall from the inside corner.
Mixing 1:6 or 1:8 to lay faster, or leaving joints half filled. Zone IV asks for 1:4 and full 10 mm joints. Bricks must be stronger than the mortar, and wetted first.
A half-brick skin built outside the slab to hide its edge leaves the lenter on 4½ inches. IS 4326 wants the full wall, at least ¾ of it, or a separate roof band.
Without bars the piers rock and the wall slides at sill or lintel level (Tip 15). A 10 mm bar at each corner, junction and jamb costs a few kg per point.
One wall finished, the next butted against it with a straight joint: the two never become one. Build corners first, stepped, or tooth both walls in 450 mm lifts.
An arch pushes sideways on the wall that holds it. IS 4326 says to avoid arches over openings, or to tie them with steel. Wide openings need a frame.
Put in your walls. The tool picks the band bar from IS 4326's table for your longest wall and counts the vertical bars, links and band concrete. It covers only the earthquake steel; slab steel is on the chhat sariya page.
Planning figures from IS 4326 and our arithmetic, not a bar bending schedule; your engineer's drawing is final. Cutting and delivery are charged separately; ask for the amount for your site (delivery). Prices are filled in from today's rate.
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
Awal eentFirst class: load-bearing and outside wallsAsk today's rateper 1,000 UltraTech PPC1:4 brickwork mortar, plinth, plaster₹ 330per bag Balu (sand)Mortar and plaster sand₹ 57per cftEvery product can be ordered; anything not on the shelf, we order for you, ask on WhatsApp how long it takes. Cutting and delivery are charged separately; ask for the amount for your site. Today's prices: cement · sariya · balu, gitti, eent. How many bricks your walls take: brick counter.
Yes, for one or two storeys, if it follows IS 4326 for Zone IV: 1:4 mortar, openings at least 450 mm from corners and within half the wall, a lintel band through every wall, 10 mm vertical bars at corners and jambs, and a lenter on the full wall. Long walls, wide openings and soft ground still need columns or a frame.
9 inches (230 mm) for every wall that carries the lenter. IS 4326 assumes at least 200 mm for walls with bands. 4½-inch walls are only for partitions that carry nothing. For two storeys the engineer may ask for thicker ground-floor walls.
Yes. IS 4326 asks for it in every category D house, on all load-bearing walls, inner ones too, and IIT Kanpur calls it the most important band. Separate lintels over each door are not a band. See Zone IV.
Not if the RCC lenter rests on the full wall, or at least three-quarters of it, and runs continuous over the inner walls. Then the slab does the band's job (IS 4326 clause 8.4.3). A tin or asbestos roof does need a roof band.
Not in Zone IV. IS 4326 gives 1:6 for categories B and C (Zones II and III) and 1:4 cement : sand, or 1:1:6 cement : lime : sand, for category D, which is an ordinary house in Muzaffarpur.
Both are IS 4326 figures for different houses. One-third (0.33) is the category D limit for three or four storeys. For one storey it is half, for two storeys 0.42. The 450 mm corner gap and 560 mm piers apply to all of them.
Only if the footing, walls and bars were sized for two floors: 12 mm vertical bars on the ground floor, openings within 42% of each wall. A house built for one floor is not. Decide before the first lenter: ground floor now, upper later.
Count from your walls: about 9.7 bricks per sq ft of 9-inch wall, in the brick counter. For a whole 1000 sq ft house with walls carrying the lenter, the 1000 sq ft list gives 350–420 bags of cement and 1.5–2.2 t of sariya. The full village list: village brick house cost.
A damp-proof course: a waterproofed concrete layer across the full wall at plinth top, so ground water can't climb into the wall. Yes, it is needed. In this house the plinth band does the job, with WP+200 in its concrete.
Send photos on WhatsApp before plaster and before dhalai: corners, door and window positions, the band steel and the corner bars. We will look at them with you. It is not a structural design; that stays with your engineer.
Civil engineer at our Rewa Road store, Muzaffarpur, where he works out cement, sariya and bricks for village houses every day. Every rule on this page was checked on 13 Nov 2026 against the text of IS 4326:1993 and the IIT Kanpur–BMTPC Earthquake Tips. Where sources differ, the page says so and takes the safer side.
We'll mark the corners and openings against the Zone IV rules and send back the cement, sariya and brick list with today's price, on WhatsApp.