How a septic tank is built: two chambers, the inlet and outlet tees, the vent pipe and the cover
Arun Tiwari, Thekedar · checked against IS 2470 (Parts 1 and 2), 14 Nov 2026
The short answer
Most houses in and around Muzaffarpur have no sewer, so the toilet line ends in a septic tank in the courtyard. It is a watertight brick box with two chambers. Toilet water comes in through a 110 mm tee that points down into the water. Solids settle and rot in the first, bigger chamber. Cleaner water passes through openings in the partition to the second chamber and leaves through a second tee, set 50 mm lower, to the soak pit. A vent pipe lets the gas out above the roof, and an RCC slab with a manhole over each chamber closes it.
2 : 1
First chamber to secondThe first holds twice as much: about ⅔ of the length.
50 mm
Outlet below inletSo water always moves forward, never back to the WC.
300 mm
Air under the slabRoom for scum and gas above the water.
Inside a septic tank
Not to scale. All figures from IS 2470 (Part 1): the Indian code for septic tanks. The partition stops short of the slab so gas from both chambers reaches one vent, as in the code's own sketch.
The parts
Eight parts, and what each one is for
The numbers match the drawing. Every size here is the code's figure; where the code says nothing, we say "usual practice".
1Inlet tee
Where the toilet line enters
A 110 mm SWR tee fixed inside the tank. The bottom leg goes about 300 mm below the water; the top leg stays open above the scum.
It drops new sewage gently below the scum without stirring the sludge (IS 2470 cl. 3.4.5.4).
One opening per chamber, at least 455 × 610 mm or 500 mm round, with an RCC or cast-iron cover that lifts and seals (cl. 3.4.9).
Slab top a little above the yard so rain runs off it.
8Walls and floor
Must hold water both ways
Brick walls at least 200 mm (a 9-inch wall is fine), plastered 12 mm inside and outside in cement mortar no weaker than 1:3 (cl. 4.2.2).
Floor of M15 concrete or better, sloped about 1 in 10 towards the end the sludge is drawn from (cl. 4.1.1).
How it works
Three things happen inside, and the tees protect all three
A septic tank is not a pit that fills up. It is a slow settling tank that stays full to its outlet all the time.
1Settle
Heavy matter sinks to the floor as sludge. That is why the floor must be watertight and why the outlet takes water from the middle, never the bottom.
2Float
Grease, soap and paper rise as scum. It looks bad but it keeps the smell in. The tees reach below it, so the scum never leaves the tank and never reaches the soak pit.
3Digest
Bacteria with no air break the sludge down, which is what makes it smaller and gives off the gas. Large amounts of phenyl, acid, bleach or detergent kill them; the code warns against these.
What leaves the tank is not clean. It is settled, not treated. IS 2470 says it must never go into an open drain or a pond without further treatment. It goes to a soak pit, which lets the soil finish the job.
Where it goes
Where to put it on a Muzaffarpur plot
Not to scale. Distances for the soak pit from IS 2470 (Part 2), cl. 5.3.
In the open, away from the house wall. The code wants the tank under the sky and as far from the building as the plot allows, never under a room or the stairs, and reachable for cleaning (cl. 3.3.1).
Not in the low, wet corner. The code says not in swampy or flood-prone spots. If the yard floods, raise the slab top above that water; see how high to raise the plinth.
The boring is the main worry. The 18 m rule is for the soak pit, the part that lets water into the ground. On a small plot that is rarely possible, so keep the pit and the boring at opposite corners. Both are covered in where to put the boring and the soak pit guide.
A straight, gently falling line from the toilet. 100 mm pipe at least (we use 110 mm SWR). Long bends with a cleaning door where it turns, and branches joining at no more than 45°. The last 12 m before the tank no steeper than 1 in 50, so the water does not churn the tank. Pipe sizes and falls: connecting the toilet to the tank.
Leave a way in for the tanker. A suction tanker on the lane must get its hose to both manholes.
The Muzaffarpur problem: water close below the ground.The Central Ground Water Board's district booklet for Muzaffarpur measured water levels between about 0.7 m and 7.6 m below ground across the district, shallowest after the monsoon. A tank 1.5 to 2 m deep can sit in ground water from August to October. So dig and build between February and May, make the walls and floor truly watertight so ground water cannot get in and sewage cannot get out, and plan cleaning before the rains.
Build order
Nine steps, from digging to the first flush
The tees are set while the walls go up, not cut in later. The drawing shows the levels the mason must hit.
Step
What to do
1. Mark and dig
Inside size from your size, plus 230 mm walls each side and working space. Dig in the dry months; keep the sides from falling in.
2. Floor
Concrete of M15 or better (IS 2470's sketch uses 1:2:4), usually 150 mm thick, sloped about 1 in 10 towards the end the sludge is drawn from. At most 25 L of water per 50 kg bag.
3. Walls and partition
9-inch brick walls in cement mortar. Leave the partition openings, 100–150 mm, about 300 mm below the future water level.
4. Set the tees
Build the inlet and outlet pipes into the walls as you go. Check with a level pipe that the outlet invert is 50 mm lower than the inlet invert.
5. Plaster
12 mm, cement mortar 1:3, inside and outside. Add Weather Pro WP+200 (200 ml per bag) to the inside plaster; give the floor-to-wall corner a coat of Seal & Dry SBR slurry first.
6. Cure and test
Keep it wet at least 7 days (10 days with PPC or slag cement, IS 456). Then fill it with water to the outlet and watch the level for a day: it must not drop.
7. Cover slab
RCC with a manhole frame over each chamber. Usual practice: about 125 mm thick, 8 mm bars both ways at about 150 mm. If a car or tractor will cross it, have an engineer design it.
8. Vent and backfill
Vent pipe up to 2 m above the roof, mesh and cowl on top. Backfill around the walls in layers; slab top above the yard.
9. Start it
Join the toilet line only when everything is complete. Keep the tank full of water to the outlet; the code suggests adding a little well-rotted cow dung if no sludge from an old tank is at hand.
What goes wrong
Six mistakes we hear about from customers
Plain pipe in place of the outlet tee
The soak pit chokes in a year or two
A straight pipe at the water line skims off the scum and sends it to the soak pit, which clogs with grease. A tee reaching below the scum costs very little.
Outlet set higher than the inlet
Water stands in the house line; the WC drains slowly
The water level rises above the inlet pipe and the line from the house stays full and silts up. Outlet invert 50 mm below the inlet, always.
No vent, or a vent cut off at the slab
Smell from the bathroom floor trap
The gas has to go somewhere. Without a vent it pushes back up the line and through any trap with a weak water seal. See why traps smell.
Roof rainwater piped into the tank
Overflows in July and flushes sludge out
The code says no surface water may reach the tank. A rain pipe fills it in minutes and pushes sludge into the soak pit. Rainwater goes to the yard drain.
Outlet into the open nali
Untreated sewage in the lane
IS 2470 says septic tank water must never go into an open drain without treatment. It goes to a soak pit, or where the ground is waterlogged, to a filter the code describes in Part 2.
Bare brick walls and a kachcha floor
"It never fills" because it leaks
A tank that never fills is pouring raw sewage into the ground water your boring draws from. Walls plastered both sides, concrete floor, water test before use.
How big
The size comes from the number of people and how often you clean it
More users or longer gaps between cleanings mean a bigger tank. The full method, with house examples, is on the septic tank size page. The code's limits for any tank:
Rule
IS 2470 (Part 1)
Inside width
750 mm or more
Water depth
1 m or more
Length
2 to 4 × width
Capacity
1,000 L or more
Air above water
300 mm or more
Users
Length × width
Water depth, cleaned yearly
Every 2 years
5
1.5 × 0.75 m
1.0 m
1.05 m
10
2.0 × 0.90 m
1.0 m
1.4 m
15
2.0 × 0.90 m
1.3 m
2.0 m
20
2.3 × 1.10 m
1.3 m
1.8 m
IS 2470 (Part 1), Appendix A, Table 5. Add 300 mm of air above the water depth. The code's note: these sizes assume only toilet water goes in. Bath and kitchen water make the tank fill and work worse, so the code sends them to their own soak pit or drain.
Material list
What your tank will take from the store
Type the inside size the mason or the size page gave you. The list covers the floor, walls, partition, plaster, cover slab and fittings, for a 9-inch brick tank built as above.
Your list
Prices are from our latest bill and change often. Please confirm today's rate on WhatsApp or call before buying.
Bricks—Walls 230 mm, partition 115 mm, about 500 per m³ plus 5% for breakageAsk today's rate
UltraTech PPC cement—Brickwork in 1:4 mortar and 12 mm plaster 1:3, both sidesAsk today's rate
Our estimate from standard mix figures (cement 6.5 bags per m³ of M15 and 8.1 of M20, as on our slab pages), not a mason's measured bill. Add 5–10% for a rough site. Soak pit material is on the soak pit page. Cutting and delivery are charged separately; ask for the amount for your site (delivery).
After it is built
Cleaning, and the one rule that saves lives
When to clean
When scum and sludge together pass half the depth. For a house tank used by the number it was built for, at least once in 2 years (IS 2470 cl. 5.1).
Too often is also bad: it removes the bacteria.
How to clean
A suction tanker from the manhole. Leave about 25 mm of sludge as seed (cl. 5.2).
Plan it for April–May. Don't pump it bone dry in the monsoon, when ground water presses on the walls.
Nobody goes inside
The gas in a septic tank can kill in minutes, and people die every year going in to save someone who fell. The code itself says manual handling of sludge should be avoided.
Keep the manhole covers locked or heavy, away from children.
Any size or brand not on the shelf, including a ready-made plastic tank, we can order for you; ask on WhatsApp for the time it takes. Today's prices: bricks, sand and gitti rates · all rates.
Questions people ask us
Short answers
How many chambers does a septic tank need? (septic tank me kitne chamber)
IS 2470 lets a tank above 2,000 litres be split into two chambers, with the first holding twice as much as the second. Small tanks may have one. Many masons here build three; that is fine as long as the first two follow these rules, but the extra chamber does not replace the soak pit.
Can bathing and kitchen water go into the septic tank?
The code sizes the tank for toilet water only and sends bath and kitchen water to a soak pit or drain of its own. Soap, detergent and grease in large amounts slow the bacteria, and the tank fills much faster.
Should the floor be left kachcha so the tank never fills?
No. IS 2470 asks for a watertight concrete floor and plastered walls. An open floor lets raw sewage into the same ground water your boring pumps up. The tank is meant to fill to its outlet; the treated water then goes to the soak pit.
How far should the septic tank be from the boring?
IS 2470 Part 2 puts the soak pit, the part that lets water into the soil, at least 18 m from any drinking-water source and at least 6 m from the house. The tank itself is sealed; keep it as far from the boring as the plot allows, in the open, away from the house wall. See where to put the boring.
How often does a septic tank need cleaning?
IS 2470 says small house tanks may be cleaned at least once in 2 years if not overloaded, and in general when scum and sludge together pass half the tank depth. Leave about 25 mm of sludge as seed. Use a suction tanker; do not empty it fully in the monsoon.
Can someone go inside a septic tank to clean or repair it?
No. The gas inside can kill in minutes, and people die every year going in to help someone who fell. Clean only with a suction tanker from the manhole. If a repair needs a person inside, the tank must be emptied, ventilated for a long time and entered only by a trained crew with breathing gear.
Is a separate vent pipe needed if the tank is joined to the soil pipe?
IS 2470 allows the tank to vent through the building's soil vent pipe instead. If it has its own vent, use at least 50 mm, put mosquito mesh and a cowl on top, and take it 2 m above the roof when the tank is within 20 m of the house.
Plastic ready-made septic tank or brick?
Both work the same way inside. A plastic tank is quick to fit but light, so in ground that floods it must be anchored as its maker says or it can lift when empty. We can order one for you; ask on WhatsApp for the time it takes.
Arun Tiwari
Thekedar · site work, costs and plumbing, Tashya Ventures
Twenty years on house sites around Muzaffarpur, many of them fixing tanks built with a plain pipe for an outlet or no vent at all. Every size on this page was read from IS 2470 (Parts 1 and 2) on 14 Nov 2026. Where the code is silent, as on the cover slab bars, the page says "usual practice"; the material list is our estimate from standard mix figures.
Where the numbers come from
Bureau of Indian Standards, IS 2470 (Part 1): 1985, Code of practice for installation of septic tanks: design criteria and construction (reaffirmed 2001): 100 mm pipes, long bends with cleaning eyes, 45° junctions, last 12 m at 1:50 (3.1–3.2); location (3.3.1); 24–48 h detention (3.4.4); 750 mm, 1 m, 1,000 L, length 2–4 × width (3.4.5); inlet tee 300 mm, outlet tee ⅓ depth, 50 mm drop (3.4.5.4–5); partition 2:1, openings 100–150 mm at 300 mm (3.4.6); 300 mm free board (3.4.8); access 455 × 610 mm or 500 mm (3.4.9); vent 50 mm, mesh, height (3.4.10); M15 floor at 1:10, 200 mm brick walls, 12 mm 1:3 plaster (4.1–4.2); desludging (5); commissioning (6); Table 5.