Bathroom fixture heights: what to mark on the wall before plaster and tiles

The short answer

Measure every height from the finished floor, not the slab. First mark a level line 1 metre above the finished floor on every wall. Then mark each point from that line, and photograph the wall with the tape in the picture before anyone plasters.

2,100
Shower arm, mmWall elbow for an overhead shower. The head ends near 2 m.
1,000
Mixer body, mmHot left, cold right. Same height as the 1 m line.
1.8 m+
Geyser socketNever lower, and out of the shower's spray.
One bathroom wall, every point
Bathroom wall elevation with every point marked A bathroom wall drawn to scale from the finished floor up to a 10 ft ceiling, with a red dashed line at 1 metre. From left: a western WC with its angle valve at 200 mm and the health faucet point at 300 mm; the stop cock at 1,200 mm; the shower mixer at 1,000 mm with the shower arm elbow at 2,100 mm; the bucket tap at 700 mm; the geyser hung above its pipe points at 1,900 mm with its socket at 2,000 mm; the basin with inlets at 550 mm and waste at 480 mm; the mirror light at 1,900 mm and the exhaust fan opening high on the wall. wall tile to 7 ft ceiling, 10 ft (3,000 mm) FINISHED FLOOR (top of the floor tile) = 0 050010001500200025003000 1 m LINE 20 L GEYSER 1 2 3 4 5 6 7 8 9 10 11 12
  1. 1WC angle valve 200 mm
  2. 2Health faucet 300 mm
  3. 3Stop cock 1,200 mm
  4. 4Mixer body 1,000 mm
  5. 5Shower arm 2,100 mm
  6. 6Bucket tap 700 mm
  7. 7Geyser points 1,900 mm
  8. 8Geyser socket 2,000 mm
  9. 9Exhaust fan 2,100 mm+
  10. 10Mirror light 1,900 mm
  11. 11Basin inlets 550 mm
  12. 12Basin waste 480 mm
Drawn to scale (1 square of the ruler = 500 mm), heights to the centre of each point. Red dots are hot, blue cold. Dashed lines are pipes inside the wall, run straight up and across. A common layout, not the only one: your WC, basin and geyser may sit on other walls, but the heights stay the same.
Before any tape goes on the wall

Start from the finished floor, which doesn't exist yet

The plumber marks the wall weeks before the floor tile is laid. So the first job is to decide where the finished floor will be, and draw one line everyone measures from.

  1. 1

    Fix the bathroom's finished floor

    Start from the room outside. The bottom of the door frame (chaukhat) is set at that room's finished floor. Usual practice keeps the bathroom a little lower than the room, so water can't run out under the door. Write the figure on the wall.

  2. 2

    Add up what sits on the slab

    In a sunken bathroom the filling, the sloped screed, the adhesive and the floor tile all go on top of the slab. Together they are never zero; on an upper floor they can be a few hundred millimetres. A height taken from the slab is wrong by all of it.

  3. 3

    Draw the 1 m line on every wall

    Mark 1,000 mm above the finished floor at the door, then carry it round every wall with a water-level tube (pani wala level pipe). Snap a chalk line. It stays visible until the tiles go on.

  4. 4

    Measure every point from the line

    Up from the line for the shower arm and geyser, down for the WC and basin. A mixer at 1,000 mm sits right on it. The floor can change later; the line doesn't.

  5. 5

    Photograph it before plaster

    Every point marked, the tape in the picture. Send it to us on WhatsApp and we will look at it with you. The same photo shows where the pipes are for the next twenty years.

Section through a sunken bathroom floor The slab at the bottom, then the sunk filling, the sloped screed, adhesive and the floor tile. The finished floor level is the top of the tile. A red dashed line is drawn 1,000 mm above it on the wall. A tape measured from the slab is marked wrong; a tape from the finished floor is marked right. Floor tile + adhesive Sunk filling Slab Screed, sloped to the trap FINISHED FLOOR: measure from here 1 m LINE · chalk it on every wall 1000 from slab ✗ ends this much too low water-level tube: both ends sit at the same height
Not to scale. How thick the filling is depends on how deep the slab was sunk; measure your own. The same 1 m line is used by the tile mason later to keep the tile rows level.

Why not just measure from the slab and add the tile? Because nobody knows the filling until the floor is done, and the slope to the floor trap makes it thicker at the door than at the trap. The 1 m line takes all of that out of the sum. Where the pipes and traps go in the floor is on plumbing before tiling.

Point by point

The heights, from the finished floor to the centre of each point

There is no single Indian standard for most of these. Where a standard or a maker gives a figure we use it and name it. Where only published guides do, we give their range and the figure inside it that suits a Bihar bathroom with a bucket. Where it is only site practice, the table says so.

Plumber · before plaster

PointMark atWhere the figure comes from
5Shower arm elbowoverhead shower, ½″ threaded point2,100 mm6′10¾″Guides give 2,000–2,150 mm to the arm (Studio Matrx) and 200–210 cm to the head (HouseGyan). Jaquar puts a fixed head at about 203 cm. The arm drops, so 2,100 at the wall puts the head near 2 m.Someone over 6 ft at home: 2,150–2,200 mm.
4Mixer or diverter bodywall mixer: hot left, cold right, 150 mm apart1,000 mm3′3¼″HouseGyan: 90–120 cm. Studio Matrx: 1,000–1,150 mm. We take 1,000: inside both, and a bucket still goes under the spout.Concealed body: its depth matters as much as its height. See below.
6Bucket tap (bib cock)the one most Bihar bathrooms use daily700 mm2′3½″Usual practice. A 20-litre bucket stands about 40 cm; 700 mm leaves room for a hand and a mug and splashes less than a high tap. Studio Matrx gives 900 mm for a washing-area tap where clothes are washed.
2Health faucet pointbeside the WC, on the side away from the wall300 mm11¾″Studio Matrx: 200–350 mm. Keep it within the hose's reach of the seat; the hook for the spray can sit higher.
1WC angle valveone-piece or floor-mounted WC200 mm7¾″Studio Matrx: 150–250 mm, about 150 mm to one side of the pan's centre. Which side depends on the WC: check its box drawing before fixing. The drain centre is a separate figure, 220 or 300 mm from the finished wall: 220 or 300 mm.
Cistern over an Orissa panwall-hung cistern such as CERA Covan700 mm+2′3½″, undersideIS 774: a low-level cistern over an Orissa or squatting pan needs at least 700 mm between the top of the pan and the underside of the cistern. A high-level cistern needs at least 1,250 mm. Angle valve just below the cistern on its inlet side (usual practice). Drawing below.
11Basin inletshot and cold, 100–150 mm apart550 mm1′9¾″Studio Matrx: 500–600 mm, centred on the bowl. The basin rim height is chosen by the family: wash basin height.
12Basin waste480 mm1′7″Studio Matrx: 450–520 mm, in the wall behind the bottle trap, or to the floor trap.
7Geyser pointsCPVC hot out, cold in; geyser hangs above1,900 mm6′2¾″Studio Matrx: 1,800–2,050 mm. The geyser hangs above its points, so on a 10 ft ceiling there is room for a 15 or 25 L tank. Havells asks for the geyser to sit at least 1 m below the water tank. Pipe and valve: geyser line.
3Stop cock for the bathroomconcealed body, on the supply line1,200 mm3′11¼″Usual practice: at hand height near the door, where the supply enters, so the room can be shut off without a stool. One per bathroom.

Electrician · before plaster

PointMark atWhere the figure comes from
8Geyser socket16 A, on its own line2,000 mm6′6¾″; never below 1.8 mUsha's geyser manual: the socket shall not be lower than 1.8 m. Studio Matrx: 1,800–2,000 mm, clear of the shower's splash. Beside the geyser, on the side away from the shower. Wire and MCB: wire size for a geyser.
9Exhaust fan openingoutside wall, away from the door2,100 mm+6′10¾″ or higherStudio Matrx: 2,100 mm or more on a wall, or the ceiling. Crompton: in or just outside the shower. Polycab: 1 CFM per sq ft of floor, at least 50 CFM. Cut the hole to the fan's frame before plaster: exhaust fan.
10Mirror lightabove the mirror top1,900 mm6′2¾″Studio Matrx: 1,800–2,000 mm, aligned with the top of the mirror. Keep pipes out of the mirror's screw area; run them straight up from the basin points only.
Geyser switch (double pole)outside the door1,350–1,500mm · 4′5″–4′11″Studio Matrx: outside the door or in the dry part. With a red indicator so nobody leaves it on.
Light and fan switchesoutside the door1,200–1,400mm · 3′11″–4′7″Studio Matrx: on the dry wall or just outside the door. No switch inside the shower area. Points for the whole room: bathroom checklist.
Orissa pan with a wall cistern
Cistern height over an Orissa pan An Orissa pan set in the floor with its rim at floor level. A wall cistern above it, with at least 700 mm from the top of the pan to the underside of the cistern for a low-level cistern, and at least 1,250 mm for a high-level cistern shown dashed above. The angle valve sits just below the cistern. high-level 1,250+ CISTERN 700+ mm, IS 774 angle valve top of pan
Measured from the top of the pan, which sits at the finished floor, to the underside of the cistern. The pan and its P-trap are bedded in before the floor tile; choose the cistern first: Orissa pan or western.

Mark the centre, and say so

Every figure here is to the centre of the point. A plumber who marks the top or bottom of a fitting puts it 10–20 mm off. Write "C" next to each mark.

Hot is always on the left, cold on the right, at the mixer, the basin and the geyser. Indian mixers are made that way; check yours before fixing.

What this page leaves to others

Which pipe and valve go to the geyser: geyser line. What to buy, lot by lot: bathroom fitting checklist. What to check on site before each trade covers the work: plumbing stage checklist.

How high to tile the walls: bathroom wall tiles.

What goes wrong

Three height mistakes that mean breaking tiles

slab filling 1,000 from slab 1,000 from floor the filling's thickness lower

Measured from the slab

Later: a shower that hits the shoulder

Every point ends lower by the whole floor build-up. The WC valve can end up under the floor tile. Use the 1 m line, as above.

brick plaster adhesive + tile min max tile face falls here ✓ plastic cover, marks printed on it

Concealed body set to the brick

Later: a handle that won't reach, or a plate that won't sit

The body goes in before plaster, but its depth is set by the tile face. Jaquar's installation sheets ask for the finished tile surface to fall between the min and max marks on the plastic cover. Add up plaster, adhesive and tile first. Our Jaquar stop cock body: concealed body.

1.8 m in the spray, low ✗ beside the geyser, above 1.8 m ✓

Geyser socket at switch height

Later: a wet socket, or a lead across the shower

Put it beside the geyser, on the side away from the shower, never lower than 1.8 m (Usha manual). Switch it from outside the door. Its line and earthing: geyser point before tiles.

For the plumber and electrician

Make your bathroom's height card

Tick what your bathroom has. The card lists only those points, in millimetres and in feet and inches, as most mistris measure. Print it and stick it on the wall, or send it on WhatsApp.

The bucket tap, stop cock, exhaust fan and switches are on every card. Heights are to the centre of each point, from the finished floor.

Height card · Tashya Ventures

From the FINISHED FLOOR to the CENTRE of each point. Mark the 1 m line first.
Send on WhatsApp

Figures from IS 774, Usha, Havells and Jaquar where they give one; published guide ranges or usual practice otherwise (sources at the foot of tashyaventures.com/bathroom/fixture-heights). Check each fitting's own drawing before fixing.

From our counter

What goes into the wall at these heights

Taps, wall mixers, concealed diverters, showers, health faucets, angle valves, geysers, exhaust fans and mirror lights: we can order them for you; ask on WhatsApp for the time it takes. We sell genuine CERA, Prince, Ashirvad and Jaquar with a GST bill. Today's prices: sanitary rates · pipe rates · electrical rates. Delivery is charged separately; ask for the amount for your site: delivery.

Questions people ask us

Short answers

What is the standard shower height from the floor? (shower kitni unchai par)

There is no Indian standard. Mark the wall elbow for an overhead shower arm at about 2,100 mm from the finished floor; the published guides give 2,000 to 2,150 mm. Jaquar gives about 203 cm as the usual height of a fixed shower head. If someone in the family is over 6 ft, go up to 2,150 to 2,200 mm.

At what height is the shower mixer fixed?

About 1,000 mm from the finished floor to the centre of the mixer or diverter body. HouseGyan gives 90 to 120 cm and Studio Matrx 1,000 to 1,150 mm; 1,000 mm sits in both and still lets a bucket go under the spout. Hot on the left, cold on the right, 150 mm apart for a wall mixer.

How high should the geyser and its socket be? (geyser kitni unchai par lagayein)

The geyser's pipe points about 1,800 to 2,000 mm from the finished floor, with the geyser hung above them. The socket goes beside the geyser, out of the shower's spray, and never lower than 1.8 m: Usha's manual says the socket shall not be lower than 1.8 m. It is a 16 A point on its own 2.5 sq mm line.

How high should the cistern be over an Orissa pan?

IS 774 says a low-level cistern over an Orissa or squatting pan needs at least 700 mm between the top of the pan and the underside of the cistern. A high-level cistern needs at least 1,250 mm. Fix the angle valve just below the cistern on its inlet side.

Should heights be measured from the slab or from the floor?

From the finished floor level, the top of the floor tile, which in a sunken bathroom can be a few hundred millimetres above the slab. Mark a level line 1 metre above the finished floor on every wall first and measure every point from that line.

How deep does a concealed body go into the wall?

So that the finished tile face falls between the minimum and maximum marks printed on its plastic cover, as Jaquar's concealed-body installation sheets say. Set it after you know the plaster, adhesive and tile thickness, and keep the cover on until tiling is done.

How high is the bucket tap in an Indian bathroom?

Usual practice is about 700 mm from the finished floor: high enough for a 20-litre bucket, about 40 cm tall, with a hand and a mug under the tap, and low enough not to splash the whole floor. A tap for washing clothes is often higher, around 900 mm.

Arun Tiwari
Thekedar · site work, costs and plumbing, Tashya Ventures

Twenty years on sites around Muzaffarpur, where the call from the plumber asking "kitni unchai par?" comes the day the chase is cut. Each figure on this page names where it comes from: a standard, a maker's manual, a published guide's range, or usual site practice.

Where the numbers come from

  1. Bureau of Indian Standards, IS 774:2004, Flushing cisterns for water closets and urinals, cl. 3.1 and 3.2: high-level cistern at least 1,250 mm from top of pan to underside of cistern; low-level not more than 300 mm, but at least 700 mm over an Orissa or squatting pan.
  2. Studio Matrx, Bathroom plumbing schedule (India): centre heights from finished floor for the shower arm (2,000–2,150), mixer (1,000–1,150), bib cock (800–1,000), health faucet (200–350), WC angle stop (150–250), basin inlets (500–600) and waste (450–520), geyser points (1,800–2,050); 30–50 mm tile and bed allowance.
  3. Studio Matrx, Bathroom electrical schedule (India): mirror light 1,800–2,000, exhaust fan 2,100+ or ceiling, geyser point 1,800–2,000, geyser isolator 1,350–1,500, switches 1,200–1,400, switches outside the wet zone.
  4. HouseGyan, Bathroom plumbing fixture height guide: shower head 200–210 cm, shower mixer 90–120 cm, basin rim 80–85 cm, all from finished floor.
  5. Jaquar, Shower head height fitting guide: fixed shower head typically about 203 cm from the floor. Jaquar group (Artize) concealed-body installation sheets: finished tile surface within the min and max marks on the protective cover. Jaquar ALD-CHR-069FT data sheet: concealed stop cock body for 15 mm line, 0.5–5 bar.
  6. Usha, Aqua Horizon storage water heater manual: supply socket not lower than 1.8 m.
  7. Havells, Instanio Prime storage water heater: at least 1 m between the water heater and the supply tank above it.
  8. Crompton, Exhaust fan installation guide: in the shower or just outside it. Polycab, How to measure and install exhaust fans: 1 CFM per sq ft, at least 50 CFM.
  9. CERA, Chanel 220 and Cinco 300 product pages: drain at 220 and 300 mm from the wall (as on our bathroom fitting checklist).
  10. Usual practice (labelled so on the page): bucket tap 700 mm, stop cock 1,200 mm, cistern angle valve below the cistern, the 1 m line and water-level tube, bathroom floor a little below the room outside.

Send us the marked wall

A photo of your bathroom wall with the points marked and a tape in the picture. We'll look at it with you before plaster, and send the pipes and fittings with today's price.