New house material list: every item from cement to fans, in the order you buy it

The short answer
  1. 1Water, neev
  2. 2Walls
  3. 3Lenter
  4. 4Pipes, boxes
  5. 5Plaster, wire
  6. 6Floor, tiles
  7. 7Putty, paint
  8. 8Fittings

A house is bought in eight lots, each on site the day its work starts. The list below has every line of all eight, with a quantity for your size. Tick each item as it arrives, print the list, or send it to us for today's rate.

65
Lines on the listFor a 1000 sq ft house with 2 bathrooms. Fewer than people fear, more than anyone remembers.
Lot 1
Pump and tank firstCuring needs water from the first pour of concrete.
96
Bags in the lenterA 5-inch slab over 1000 sq ft; 77 at 4 inches, 115 at 6.
One house, eight lots
Where each lot of material goes in a house Cutaway of a one-storey house. 1: pump, tank and foundation below ground. 2: walls and columns. 3: the roof slab. 4: pipes and switch boxes inside the walls. 5: plaster and wire. 6: floor, waterproofing and tiles. 7: putty and paint. 8: fittings: fan, tap, WC, switches and inverter. 1 1 2 3 4 5 6 7 8 1 Water, neev, plinth 2 Walls, columns 3 Lenter (roof slab) 4 Pipes, boxes 5 Plaster, wire 6 Floor, tiles 7 Putty, paint 8 Fittings borewell
Not to scale. Numbers show the lot each part is bought in. The pump and tank (lot 1) come before the foundation because every pour needs curing water.
Your list

Every item for your house, lot by lot

Put in your house. Each line gives a low and a high figure from the same planning figures as our 1000 sq ft cost page and the makers' coverage sheets. Buy to the high figure; your engineer's drawing and plumber's and electrician's layouts decide the final order.

Not sure which structure? RCC frame or brick walls. Plinth in a flood area: how high. Land in katha or dhur: convert to sq ft.

Send the whole list Send only what's not ticked Ticks stay on this phone or computer. The PDF carries our name and number, so a mistri or family member can order from it.
TASHYA BUILDING SOLUTIONS · New house material list199 Patahi Rd (Reva Road), near Shiv Mandir, Bhagwanpur, Muzaffarpur 843113 · WhatsApp 90310 74624 · tashyaventures.com
0 of 0 bought

Planning figures, not a bill of quantities. Cement, balu and gitti are split by stage in the same shares as the worked house on our cement and balu and gitti pages. Fittings counts are usual practice. Prices: Ask rate until today's rate is sent. Cutting and delivery are charged separately; ask for the amount for your site (delivery). Every product can be ordered; anything not on our shelf, we order for you, ask on WhatsApp for the time it takes.

Buy these a lot early

What gets buried is bought before the thing that buries it

Concrete, plaster, tiles and paint each cover what went in before them. A missed sleeve or box found later means breaking something. So these lines sit one lot ahead of where you might expect them.

What each layer covers
Items that must be in before each covering layer Four covering layers in order: slab concrete, plaster, tiles, putty and paint. Before the slab: pipe sleeves, slab conduit and fan boxes. Before plaster: switch boxes, wall conduit, water and drain pipes, mixer bodies. Before tiles: waterproofing with a 48 hour water test and the geyser line. Before putty: wire pulled and tested. SLAB PLASTER TILES PUTTY, PAINT lot 3lot 4lot 6lot 5 Pipe sleeves Slab conduit Fan boxes Before the pour.After it, only acore cutter getsthrough. Switch boxes Wall conduit Water pipes Mixer bodies Pressure-testedbefore plaster. Waterproofing Geyser line Floor traps 48 h water teston the coat beforeany tile goes on. Wire pulled DB box set Tested Pulled afterplaster, beforethe first putty.
Order of checks from our wiring, plumbing and bathroom-waterproofing pages. The red "lot" shows where each item sits on the list above.

Lot 1Pump, tank and water

Borewell, pump and a tank go in before the foundation. Every pour needs curing water, and the slab needs 10 to 14 days of it. Which pump: 0.5 HP or 1 HP; tank size: by family.

Lot 1Anti-termite

The soil is treated while the trench is open and again on top of the plinth filling. Once the floor is down, the only way in is drilling. When and where to treat.

Lot 6Waterproofing before tiles

Two coats in the sunk floor, a 48-hour water test, then two coats under the tiles. Bathroom waterproofing.

Lot 8Visible fittings last

WC, basin, taps, switches and fans come after paint, so nothing gets chipped or splashed. Keep the boxes sealed until the day. Bathroom fitting order.

Using the list on site

Fix the list once, take delivery lot by lot

Settle brands and quantities at the start, so the thekedar can't switch a bag halfway. Then let each lot arrive when its work starts.

1Fix it

Fill the list, print it, and give one copy to the thekedar. When someone asks for "a few more bags", the list shows whether the stage is already over its figure.

2Order a lot

Send the lot that starts next. Cement kept for months loses strength, and in the monsoon faster; sariya in the open rusts; tiles and sanitaryware get chipped on a busy site.

3Tick at the gate

Count bags and bundles before the truck leaves, then tick. How to check what arrives: cement · sariya · wire.

Not on this list: labour, doors and windows, grills, the borewell boring itself, the naksha fee and the boundary wall. They are separate lines in your budget: what a per-sq-ft figure leaves out.

Questions people ask us

Short answers

Ghar banane me kaun kaun sa material lagta hai?

Eight lots: water and foundation (pump, tank, anti-termite, cement, sariya, balu, gitti, filling), walls (bricks and mortar), the lenter, pipes and boxes before plaster, plaster and wire, floor with waterproofing and tiles, putty and paint, then the fittings: WC, basin, taps, fans, lights, switches, MCBs and inverter. The list above gives each line with a quantity for your size.

Why is the pump in the first lot?

Curing needs water from the first pour of foundation concrete, and the slab needs 10 to 14 days of it. Put in the borewell, pump and a tank before the foundation, not after the house is built.

1000 sq ft me kitna cement lagega?

About 350 to 420 bags when brick walls carry the roof and 400 to 500 bags for an RCC frame, of which about 96 go into a 5-inch roof slab. The list splits the total by stage so each lot arrives fresh. The working: cement for 1000 sq ft.

Can I buy the whole list at once?

Fix the brands and the list at the start, but take delivery lot by lot. Cement loses strength in storage, especially in the monsoon, sariya rusts in the open, and tiles and sanitaryware get chipped on a working site.

Does this list include labour, doors and windows?

No. It is the material a building store supplies. Labour, doors, windows, grills, the borewell boring and the naksha fee are separate budget lines, explained on our 1000 sq ft cost page.

Why are vitrified floor tiles listed with Vitribind and not the cheaper adhesive?

Birla White's TileStix Intero Grip+ (TX2) is for ceramic tiles up to 450 × 450 mm indoors. Our 2 × 2 vitrified tiles need TileStix Vitribind, and 2 × 4 tiles, planks and outdoor tiles need Extero. Putty never goes under tiles.

I'm putting sheets on the top floor. What changes?

The top slab drops off the list: its cement, gitti, balu and slab sariya. In their place come the sheets and a concrete band on top of the walls, which a brick house in earthquake zone IV needs. Count the sheets with how many roofing sheets.

Arun Tiwari
Thekedar · site work, costs and plumbing, Tashya Ventures

Arun Tiwari has run house sites around Muzaffarpur and plans material lists with customers at our Reva Road store. The structure lines use the same planning figures as our cost and calculator pages; the finishing lines use the makers' coverage sheets; fittings counts are usual practice. Checked 14 Nov 2026.

Where the numbers come from

  1. Cement 0.40–0.50 bag/sq ft (RCC frame), 0.35–0.42 (brick walls); sariya 3.5–4.5 t and 1.5–2.2 t per 1000 sq ft; balu, gitti and bricks per sq ft: standard planning figures, as on our house construction cost calculator and 1000 sq ft cost page.
  2. Slab cement 77 / 96 / 115 bags for 4 / 5 / 6 inches over 1000 sq ft; stage shares of cement, balu and gitti from the worked house: cement for chhat dhalai, cement for 1000 sq ft, balu and gitti for 1000 sq ft (plinth filling 0.9 cft per sq ft of floor per ft of plinth).
  3. Slab sariya 1.3–1.4 t per 1000 sq ft: sariya in a roof slab. Binding wire 8–10 kg per tonne. Standard weight per metre: d² ÷ 162 kg.
  4. UltraTech, Weather Pro WP+200: 200 ml per 50 kg bag. Weather Pro Hi-Flex: 1 kg covers 14–15 sq ft for one coat.
  5. Birla White: TileStix 55–60 sq ft per 20 kg bag at a 3 mm bed (less on a thicker bed); TX2 for ceramic up to 450 × 450 indoors; WallCare 17–20 sq ft per kg for 2 coats; ActivCoat Interior 110–140 sq ft/L on plaster, 170–200 on putty.
  6. Birla Opus sheets: Style Color Smart 120–140 sq ft/L, Style Perfect Start 80–100, Style Power Bright 50–60 for 2 coats; Style Super Bright distemper 70–90 sq ft/kg.
  7. Birla Pivot catalogue pp. 61–64: 600 × 600 box 4 tiles, 15.5 sq ft; 300 × 450 box 8.72 sq ft; 300 × 300 box 7.75 sq ft.
  8. Everest: a 1.05 m sheet laid gives 1.01 m width; a 3 m sheet covers 2.88 m² (about 31 sq ft) after laps. IS 3007 for the 150 mm end lap.
  9. Water 135 L a person a day, IS 1172's lower figure; pump and pull limits: 0.5 HP or 1 HP. Inverter formula and appliance watts: V-Guard, as on inverter size. 30 mA RCCB: CEA safety regulations 2023.
  10. Anti-termite: IS 6313 (Part 2), 5 L/m² on flat soil, 7.5 L/m² against walls, as on termite treatment.

Send us your list

Fill it above and press send. We'll reply with today's price for each lot, on WhatsApp. Before dhalai and before plaster, send photos and we'll look at them with you.